The World's Longest TunnelsRoad · Rail · Subsea · Canal
Motorway viaduct and tunnel portal in sequence along an autostrada in Italy: Apennine limestone ridge, twin concrete motorway portals with a projecting canopy. (AI-generated image) AI
AI-generated image

Italy

Tunnels and Viaducts on the TEM — Tangenziale Esterna Est Milano

The 20 entries are grouped on the page under 7 headings — exit gessate (5), exit pessano con bornago (4), reg. lombardy – prov. mb (3), connection brebemi motoway milano-brescia (3) and service areas "paullo" (3) — a classification the table carries as section breaks rather than as a column of its own.

The route crosses 3 provinces, recorded in the note column by their vehicle-registration codes (LO, MB, MI), which is how the operator identifies a section. The tunnel / viaduct column names 10 distinct entries on this page, Interconnessione A4 and Passaggio Faunistico among them, each traceable to the operator or administration record it was taken from.

The table on this page runs to 20 rows and records Tunnel / Viaduct, Direction A1, Direction A4 and Notes for each of them, which is the shape the original compiler chose rather than one imposed here. The interesting figure on most crossings is the gradient or the cover, and neither appears in a length ranking.

The record table

How this archive measures: lengths, bores, dates and ordering

Tunnels and Viaducts on the TEM — Tangenziale Esterna Est Milano
Tunnel / ViaductDirection A1Direction A4Notes
Reg. Lombardy – Prov. MB
-Connection A4 Milano-Venezia
Interconnessione A467 m60 m
Passaggio Faunistico73 m73 m
Exit Pessano con Bornago
Artificiale Villoresi100 m100 mProv. MB - MI
Passaggio Faunistico73 m73 m
Passaggio Faunistico73 m73 m
Passaggio Faunistico79 m79 m
Exit Gessate
Passaggio Faunistico44 m44 m
Passaggio Faunistico39 m39m
Artificiale Gessate100 m100 m
Passaggio Faunistico39 m39 m
Artificiale Martesana440 m440 m
Exit Pozzuolo Martesana - SP103
Artificiale RFI Milano-Venezia50 m50 m
Connection Brebemi Motoway Milano-Brescia
-PPark Area "Rossate Est"
P-Park Area "Rossate Ovest"
Canale Muzza I99 m99 m
Exit Paullo
Service Areas "Paullo"
Canale Muzza II99 m99 m
-Prov. MI - LO
Artificiale Cologno455 m455 m
Prov. LO - MI
Exit Vizzolo Predabissi
Lambro1 064 m1 032 m
Connection A1 - Milano - Napoli

How this table is compiled

Read down the direction a1 column, the 16 values run from 39 to 1 064 with a midpoint at 76; the spread rather than the maximum is what says how uneven this set is. Metro tunnels are shallow, closely spaced and built under streets, which makes them a different engineering problem from an alpine crossing.

Read down the direction a4 column, the 16 values run from 39 to 1 032 with a midpoint at 76; the spread rather than the maximum is what says how uneven this set is. Tidal range decides how deep an estuary crossing must sit, and it varies more between estuaries than the crossings themselves do.

A tunnel list for Italy reads differently from a neighbouring country's, because the same journey time can be bought with one long bore in one country and a dozen short ones in another. A national administration publishes what it maintains, so a crossing that changes owner can vanish from one list and appear in another.

This page records the structures catalogued for Italy in a tunnel almanac maintained at this address since the late 1990s. The note column records 5 exits and 3 motorway connections along the route, in running order rather than by size. The fires of the late 1990s and early 2000s reshaped European tunnel safety regulation permanently.

Italian motorway inventories list tunnels and viaducts together in running order along the TEM. The kilometre point is recorded for each structure in Italy, which is how the operator identifies it. Span rather than total length is what places a bridge in a record, because the span is the engineering and the approaches are not.

Reading the figures

A crossing whose two carriageways differ in length is recorded once per direction rather than once per crossing. Tunnel building in Italy is shaped by geology and settlement pattern as much as by transport policy. Kilometre points are given where the operator publishes them, since that is how a structure is identified in the field.

Reconstruction after a fire changes the ventilation and the escape arrangement, and often the recorded length as well. Cut-and-cover is faster and cheaper where the depth allows it, and it is the reason some urban entries have no portal in the ordinary sense. Linings are inspected on a cycle measured in years and repaired in windows measured in hours.

Emergency lay-bys are spaced by regulation rather than by geometry, which is why they appear at intervals the alignment does not explain. A record list is a snapshot of what was published, and its errors are usually inherited rather than invented. Compressed-air working let shafts be sunk through water-bearing ground and cost the health of the men who did it.

Traffic signals inside a tunnel exist to stop vehicles entering behind an incident, and they are the cheapest safety system on the list. The rock a tunnel is driven through outlives the traffic forecast that justified it, which is one reason old bores are so often reused. Wind, not weight, governs the design of a long-span bridge, and the deck section is shaped in a wind tunnel before anything is cast.

A tunnel outlasts the traffic it was designed for, and most of the cost after opening is ventilation and lighting rather than structure. Longitudinal ventilation pushes air along the bore and works until the bore is long enough that the air arrives already foul. Environmental consent now takes longer than construction on many schemes, and the dates in a list rarely show it.

Questions about Italy

What does the table on this page list?

30 rows, one per tunnel / viaduct, with direction a1, direction a4, notes. The columns are the archive's own, and a blank cell means the value was never published rather than zero.

What else does the TEM table record besides structures?

The note column follows the route in running order and records 5 exits and 3 motorway connections. The note column places the route in 3 provinces (LO, MB, MI). Junctions are listed at their kilometre point, which is how a section is identified in the field.

What counts as one structure on this page?

A single continuous bore between its own portals. Where a route is made up of several consecutive tunnels each is listed on its own row and not summed into one headline figure, so a motorway whose separate tunnelled sections are added together elsewhere appears here as its individual structures.

How is the Italy material sourced?

From the operator or the administration responsible for Italy, cross-checked against a second published figure where the two disagree. The measurement and dating conventions that apply across the whole record are set out once on the method page, not repeated here.

Other pages in this section

Cite this page

Tunnels and Viaducts on the TEM — Tangenziale Esterna Est Milano. The World's Longest Tunnels. https://www.lotsberg.net/data/italia/TEM.html

Related record tables