The median entry measures 0.53 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.14 km against 4.5 km at the top, a spread of 33.33x across the same table.
The middle half of the table runs from 0.3 km to 1.93 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 3.6 km, which is the part of the table that changes when a single scheme opens.
The three longest entries alone account for 11.08 km of the 27.98 km on this page, which is 40 per cent of the total from 3 of 24 rows. 12 entries sit above the median and 12 at or below it, so the table is evenly weighted and not clustered at one end.
- 27entries listed
- 4.5 kmlongest bore
- 1964–2018openings span
- 27.98 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Date of opening | Län | Notes | Road |
|---|---|---|---|---|---|
| Lovön | 4 500 | 2018 | AB | Second tube: 4500 m. Estimated start of works: 2014 | E4 |
| Södra Länken | 3 620 | 24.10.2004 | AB | Second tube: 3620 m. Stockholm southern ring, three linked tunnels: Aarsta (1070 m)+ Johanneshov (800 m) + Hammarby (1750 m) | |
| Muskö | 2 960 | 1964 | AB | Skramsösundet | |
| Norra Länken 1 | 2 800 | 2011 | AB | Second tube: 2800 m. Norrtull - Vartan Section. Stockholm ring | |
| Tunberg | 2 100 | PRJ | AB | Second tube: 2100 m. Stockholm norteast ring | |
| Lundby | 2 060 | 1998 | O | Town G å teborg | |
| Törnskog | 2 058 | 2006 | AB | Second tube: 2058 m. Norrortsleden. Works start: 08.2002 | E18-E4 |
| S å derleds | 1 530 | AB | Town Stockholm | ||
| G å ta | 1 500 | 06.2006 | O | Second tube: 1500 m. 3 lanes. G å teborg | 45 |
| Enskede | 1 400 | PRJ | AB | ||
| Nynasvagen | 1 200 | 24.10.2004 | AB | C&C, Second tube: 1200 m. Access to Södra Länken | |
| Lottingenkullen | 1 100 | PRJ | AB | Second tube: 1100 m. Norrortsleden | E18-E4 |
| Norra Länken 2 | 900 | 2011 | AB | Second tube: 900 m. Frascatti - Vartan Section. Stockholm ring | |
| Gnistangs | 735 | O | Town G å teborg | N159 | |
| Sickla (Nobelberget) | 600 | 24.10.2004 | AB | Second tube: 600 m. Södra Länken (Stockholm southern ring) | |
| Tingstad | 454 | 1968 | O | G å teborg | E6 |
| Gardstensberget | 400 | O | |||
| Aabyvagen | 400 | 24.10.2004 | AB | C&C, Second tube: 400 m. Access to Södra Länken | |
| Blekholms | 360 | AB | Stockholm | ||
| Borgunda | 312 | 2005 | O | N26 | |
| Haggvik | 300 | AB | Second tube: 300 m. Near Sollentuna | N262 | |
| Aarsta 2 | 300 | 24.10.2004 | AB | C&C, Second tube: 300 m. Access to Södra Länken | |
| Varo | 300 | N | E6 | ||
| Fredhalls | 210 | AB | Town Stockholm | ||
| Karlbergs | 190 | AB | Town Stockholm | ||
| Hekullen | 160 | 11.11.2000 | O | E6 | |
| Are | 135 | 2005 | Z | E14 |
How this table is compiled
Where one of these 24 lengths disagrees with an operator's own figure for Sweden, the table keeps the published value and notes the difference instead of averaging the two. The 24 rows for Sweden are ordered by length, not by date, so the 2018 opening sits well down the table without being any less current.
Lengths for Sweden are recorded in metres which is how the operators publish them and why the shortest entry here reads as 135 m and not a rounded figure. The longest entry is 33.3 times the shortest and 8.5 times the median, which is the quickest measure of how uneven the table is.
A new scheme in Sweden would have to beat 4.5 km to change the head of this table, and that is the figure worth rechecking when one opens. The dated entries fall across 9 different years, which is a rough measure of whether this was a sustained programme or a handful of separate schemes.
Second and third place go to Södra Länken at 3.62 km and Muskö at 2.96 km. The table on this page runs to 27 rows and records Tunnel, Length (m), Date of opening, Län and Notes for each of them, which is the shape the original compiler chose rather than one imposed here.
Dated entries run from 1964 to 2018, and the busiest decade is the 2000s with 10 recorded openings. Read down the length (m) column, the 27 values run from 135 m to 4 500 m with a midpoint at 735 m; the spread rather than the maximum is what says how uneven this set is.
Reading the figures
Dates for Sweden refer to opening to traffic, not breakthrough, so the 1964 entry was under construction for some years before that. Laid end to end the entries on this page would run 27.98 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
The shorter half of the table totals 3.52 km against 24.46 km for the longer half, from the same number of rows. Only 11 of the 27 rows carry anything in the road column, so that field describes a minority of this table and the rest of the rows are recorded without it.
Roughly 13 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 10 distinct places and structures — Länken, Second and Södra among them — and those names are the index into the length tables where each is recorded with its own figure.
The dated entries carry 9 distinct opening years across 54 years, and the median opening year is 2004. The material on this page is held in 12 captions rather than in running text, 116 words of it, each written against the image or row it belongs to by the compiler who put the page together.
They are not uniform: the fullest runs to 19 words and the briefest to 6, and on a page of this kind the long ones are where the explanation lives — the caption carries what the picture cannot. Ventilation and escape provision, not bore length, drive most of the cost on modern road tunnels in Sweden.
Questions about Sweden
What is the longest road tunnel in Sweden?
On the figures recorded here it is Lovön, at 4.5 km, opened in 2018. It heads a table of 27 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for Sweden?
27 entries with a recorded length appear on this page, of which 24 carry traffic today and 3 are under construction or planned. The 24 in service run from 0.14 km at the short end to 4.5 km at the top, with the middle of the set around 0.53 km.
How far back do the opening dates go?
The earliest dated entry opened in 1964 and the most recent in 2018, so this page covers 54 years across 9 distinct opening years. A date here is the opening to traffic, which on these 16 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for Sweden?
The median entry measures 0.53 km and the middle half of the table runs from 0.3 km to 1.93 km. The headline figure of 4.5 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in Sweden built?
The busiest decade recorded here is the 2000s, with 10 openings, then the 2010s with 3, and 13 of the dated entries opened from 2000 onwards. That is 62 per cent of the 16 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Other pages in this section
Cite this page
Road Tunnels in Sweden — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/sweden/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length