54 rows are rendered in total, so 1 of them carry a note or a blank where a length belongs and are shown without being counted. The middle half of the table runs from 0.3 km to 0.92 km, and that band is where most of the engineering on this page actually sits.
The median entry measures 0.44 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.08 km against 3.24 km at the top, a spread of 43.16x across the same table.
The three longest entries alone account for 7.62 km of the 37.1 km on this page, which is 21 per cent of the total from 3 of 52 rows. 26 entries sit above the median and 26 at or below it, so the table is evenly weighted and not clustered at one end.
- 53entries listed
- 3.24 kmlongest bore
- 1832–2011openings span
- 37.1 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Date of opening | Region | County | Notes | Road |
|---|---|---|---|---|---|---|
| Mersey Queensway | 3 237 | 18.07.1934 | NOW | ME | Subaqueous tunnel, Liverpool | |
| Mersey Kingsway | 2 483 | 24.06.1971 | NOW | ME | Two tubes. Subaqueous tunnel, Liverpool | |
| Stonehenge | 2 100 | - | SOW | WT | Second tube: 2000 m. Project erased on 06.12.2007 | A303 |
| Hindhead bypass | 1 900 | 2011 | SOE | SU | Second tube: 1900 m. Breakthrough Feb. 2009 | A3 |
| Limehouse Link | 1 800 | 17.05.1993 | SOE | LO | River Thames, London | |
| Rotherhithe | 1 705 | 12.06.1908 | SOE | LO | River Thames, London | |
| Tyne | 1 645 | 1967 | NOR | NT | Town Newcastle. Second tube: 1645 m (2011, works start: 2008) | A19 |
| Dartford | 1 436 | 18.11.1963 | SOE | LO | Second tube: 1429 m (05.1980). River Thames, London | A282 |
| Hatfield | 1 400 | 1986 | SOE | HF | Second tube: 1400 m | A1 |
| Blackwall | 1 362 | 22.05.1897 | SOE | LO | River Thames, London. Second tube: 1201 m (2.08.1967) | A102 |
| Heathrow airport | 1 300 | 03.2005 | SOE | LO | Second tube: 1300 m. Two bores 8.1m diameter, concrete segmental lining, private tunnel located "Airside" at Heathrow Airport. | |
| Worthing - Lancing | 1 200 | Second tube: 1200 m | A27 | |||
| Conwy | 1 089 | 1991 | WAL | CN | Two tubes. Under Conwy estuary, North Wales | A55 |
| Pen-y-Clip | 930 | 15.10.1983 | WAL | CN | A55 | |
| Cargo | 885 | SOE | LO | Heathrow airport | ||
| Ramsgate | 800 | 05.2000 | SOE | KE | ||
| Clyde | 760 | 1963 | SCO | SC | Second tube: 760 m. Under Clyde river, Glasgow | A739 |
| Medway | 720 | 1996 | SOE | KE | River crossing. Two tubes | |
| Butetown | 715 | SG | WAL | Two tubes. Cut&cover, near Cardiff, Wales | A4232 | |
| Holmesdale | 650 | SOE | LO | Second tube: 650 m | M25 | |
| Penmaenbach | 642 | 1988 | WAL | CN | Shortest tube: 170 m. Town Gwynedd | A55 |
| Heathrow airport | 628 | SOE | LO | Second tube: 628 m. Cut and cover tunnel under the runway. | ||
| Epping | 600 | SOE | LO | Two tubes | M 25 | |
| Queensway | 548 | WEM | WM | Second tube: 548 m. Town Birmingham | ||
| Central Library | 500 | WEM | WM | Town Birmingham | ||
| Southwick Hill | 490 | 1994 | SOE | ES | Second tube: 490 m. Town Brighton | A27 |
| Bell Common | 450 | SOE | LO | Second tube: 450 m | M25 | |
| St.Helier | 420 | Island of Jersey | ||||
| Cuilfail | 420 | SOE | ES | Town Lewes | A26 | |
| Manchester airport | 400 | NOW | MA | Second tube: 400 m | A538 | |
| Saltash | 370 | 1981 | SOW | CO | Tunnel revisioned in 1999 | A38 |
| Westgate | 367 | YOH | WY | Second tube: 367 m. Leeds inner ring | A58 | |
| Roundhill | 365 | KE | SOE | |||
| Strand underpass | 365 | |||||
| Crindau | 362 | Second tube: 362 m. M4 Traffic Map | M4 | |||
| Thames | 350 | 25.03.1843 | SOE | LO | Two tubes. First river crossing, London | |
| Chestfield | 320 | KE | SOE | |||
| Park Lane | 314 | SOE | LO | Shortest tube: 306 m. Town London | ||
| Fore Street | 310 | A406 | ||||
| George Green | 300 | A12 | ||||
| Woodpecker | 298 | YOH | WY | Second tube: 367 m. Leeds inner ring | A58 | |
| Meir | 280 | WEM | SF | A50 | ||
| Fort Regent | 253 | Island of Jersey | ||||
| Hanger Lane | 241 | SOE | LO | Second tube: 241 m. Town London | A40 | |
| Victoria avenue | 237 | YOH | WY | Second tube: 237 m. Town Leeds | A658 | |
| Lancaster Circus | 197 | WEM | WM | Town Birmingham | A34 | |
| St. Chads Circus | 192 | WEM | WM | Second tube: 192 m. Town Birmingham | A38 | |
| Gibraltar Hill | 185 | WAL | MG | Second tube: 185 m.Town Monmouth | A40 | |
| Green Man | 174 | A12 | ||||
| Matthew Murray | 160 | YOH | WY | Second tube: 160 m. Town Leeds | ||
| Well Hall | 156 | SOE | KE | Second tube: 156 m. Rochester way | A2 | |
| Baeminster | 110 | 1832 | SOW | DO | A3066 | |
| Bluewater Quarry | 75 | 12.1995 | SOE | KE | Second tube: 75 m. Town Dartford | |
| East India Dock |
| — | Region |
|---|---|
| NOR | Northern |
| NOW | North West |
| SCO | Scotland |
| — | Region |
|---|---|
| SOE | South East |
| SOW | South West |
| WAL | Wales |
| — | Region |
|---|---|
| WEM | West Midlands |
| YOH | Yorkshire and Humberside |
| — | County | Main Town | Region |
|---|---|---|---|
| KE | Kent | Maidstone | SOE |
| LA | Lancashire | Preston | NOW |
| LD | Londonderry | Londonderry | NIR |
| LE | Leicestershire | Leicester | EAM |
| LI | Lincolnshire | Lincoln | EAM |
| LO | Greater London | London | SOE |
| LT | Lothian | Edinburgh | SCO |
| MA | Greater Manchester | Manchester | NOW |
| ME | Merseyside | Liverpool | NOW |
| MG | Mid Glamorgan | Cardiff | WAL |
| NF | Norfolk | Norwich | EAA |
| NG | North Glamorgan | Swansea | WAL |
| NH | Northamptonshire | Northampton | EAM |
| NO | Nottinghamshire | Nottingham | EAM |
| NT | Northumberland Tyne and Wear | Newcastle upon Tyne | NOR |
| NY | North Yorkshire | Northallerton | YOH |
| OR | Orkney | Kirkwall | SCO |
| OX | Oxfordshire | Oxford | SOE |
| PW | Powys | Llandrindod Wells | WAL |
| SC | Strathclyde | Glasgow | SCO |
| SF | Staffordshire | Stafford | WEM |
| SG | South Glamorgan | Cardiff | WAL |
| SH | Shetland | Lerwich | SCO |
| SK | Suffolk | Ipswich | EAA |
| SM | Somerset | Taunton | SOW |
| SP | Shropshire | Shrewsbury | WEM |
| SU | Surrey | Kingston u.Tyne | SOE |
| SY | South Yorkshire | Barnsley | YOH |
| TR | Tyrone | NIR | |
| TY | Tayside | Dundee | SCO |
| WI | Western islands | Stornoway | SCO |
| WM | West midlands | Birmingham | WEM |
| WS | West Sussex | Chichester | SOE |
| WT | Wiltshire | Trowbridge | SOW |
| WW | Warwichshire | Warwich | WEM |
| WY | West Yorkshire | Wakefield | YOH |
How this table is compiled
Where one of these 52 lengths disagrees with an operator's own figure for the United Kingdom, the table keeps the published value and notes the difference instead of averaging the two. Dates for the United Kingdom refer to opening to traffic, not breakthrough, so the 1832 entry was under construction for some years before that.
Lengths for the United Kingdom are recorded in metres which is how the operators publish them and why the shortest entry here reads as 75 m and not a rounded figure. The shorter half of the table totals 7.22 km against 29.88 km for the longer half, from the same number of rows.
A new scheme in the United Kingdom would have to beat 3.24 km to change the head of this table, and that is the figure worth rechecking when one opens. After the 1990s the next busiest decade here is the 1980s with 4 openings, so the building effort came in more than one wave.
This page records the road tunnels catalogued for the United Kingdom in a tunnel almanac maintained at this address since the late 1990s. Laid end to end the entries on this page would run 37.1 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
Dated entries run from 1832 to 2011, and the busiest decade is the 1990s with 5 recorded openings. The table on this page runs to 53 rows and records Tunnel, Length (m), Date of opening, Region and County for each of them, which is the shape the original compiler chose rather than one imposed here.
Reading the figures
Between the longest and the tenth-longest the drop is 1.94 km, which is the part of the table that changes when a single scheme opens. The tunnel column names 52 distinct entries on this page, Mersey Queensway and Mersey Kingsway among them, each traceable to the operator or administration record it was taken from.
The dated entries carry 20 distinct opening years across 179 years, and the median opening year is 1983. Read down the length (m) column, the 53 values run from 75 m to 3 237 m with a midpoint at 450 m; the spread rather than the maximum is what says how uneven this set is.
Roughly 3 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 19 distinct places and structures — London, Thames and Wales among them — and those names are the index into the length tables where each is recorded with its own figure.
The earliest dated entry is Rotherhithe, opened in 1908, and the most recent is Hindhead bypass in 2011. The material on this page is held in 25 captions rather than in running text, 191 words of it, each written against the image or row it belongs to by the compiler who put the page together.
One of those 53 is recorded as under construction or planned, Stonehenge at 2.1 km, so the count includes it while every measured figure — the range, the median, the total — describes the 52 rows carrying traffic today: an unopened bore cannot hold a record. Road tunnel lengths are measured portal to portal along the carriageway.
Questions about the United Kingdom
What is the longest road tunnel in the United Kingdom?
On the figures recorded here it is Mersey Queensway, at 3.24 km, opened in 1934. It heads a table of 53 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for the United Kingdom?
53 entries with a recorded length appear on this page, of which 52 carry traffic today and one is under construction or planned. The 52 in service run from 0.08 km at the short end to 3.24 km at the top, with the middle of the set around 0.44 km. The table renders 54 rows in total; the rest carry a note or a blank where a length belongs.
How far back do the opening dates go?
The earliest dated entry opened in 1832 and the most recent in 2011, so this page covers 179 years across 20 distinct opening years. A date here is the opening to traffic, which on these 21 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for the United Kingdom?
The median entry measures 0.44 km and the middle half of the table runs from 0.3 km to 0.92 km. The headline figure of 3.24 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in the United Kingdom built?
The busiest decade recorded here is the 1990s, with 5 openings, then the 1980s with 4, and 3 of the dated entries opened from 2000 onwards. That is 24 per cent of the 21 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Other pages in this section
Cite this page
Road Tunnels in the United Kingdom — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/UK/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Railway Tunnels in the United Kingdom — 25 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length