The median entry measures 0.3 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.02 km against 2.94 km at the top, a spread of 133.73x across the same table.
The middle half of the table runs from 0.13 km to 0.55 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 2.22 km, which is the part of the table that changes when a single scheme opens.
The three longest entries alone account for 7.85 km of the 28.56 km on this page, which is 28 per cent of the total from 3 of 63 rows. Dates for Bosnia and Herzegovina refer to opening to traffic, not breakthrough, so the 1983 entry was under construction for some years before that.
- 63entries listed
- 2.94 kmlongest bore
- 1983–2017openings span
- 28.56 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Date of opening | Second tube (m) | Notes - Section | Road |
|---|---|---|---|---|---|
| Vijenac / 1 Mart | 2 942 | 25.08.2014 | 2 912 | Lot 2 Karuše – Tarcin (Sarajevo south), km 4+437, Bilješevo - Drivuša (Zenica-Süd) section | A1-E73 |
| Suhodol / 25 Noveml | 2 802 | 07.10.2014 | 2 743 | Lot 2 Karuše – Tarcin (Sarajevo south), km 17+100, Lepenica - Tarcin section | A1-E73 |
| Cemerno | 2 109 | 01.07.2013 | - | Breakthrough: 30.10.2011, Gacko- Foca section | M20 |
| Sikola 1 | 1 190 | - | Maglaj bypass (Section Zenica-Doboj) | M17 | |
| Vranduk 1 | 1 011 | - | Doboj-Zenica section, km 64+590 | M17 | |
| Stambolcic | 954 | - | Pale - Praca | M5 | |
| Karaula | 902 | 31.12.2015 | - | Olovo-Kladanj | M18 |
| Vis (Grabosjec) | 888 | 07.10.2014 | 834 | Lot 2 Karuše – Tarcin (Sarajevo south), Lepenica - Tarcin section | A1-E73 |
| Gaj | 874 | 07.10.2014 | 865 | Lot 2 Karuše – Tarcin (Sarajevo south), Vlakovo - Lepenica section | A1-E73 |
| Nezuci | 725 | - | M5 | ||
| Ivan | 645 | - | M17 | ||
| Vatrište II | 632 | - | M5 | ||
| Celjigovici | 580 | - | Sarajevo-Pale, Lapišnica – Ljubogošta section | M19 | |
| Zepce | 580 | - | M17 | ||
| Tulica | 555 | 07.10.2014 | 335 | Lot 2 Karuše – Tarcin (Sarajevo south) | A1-E73 |
| Crnaja | 550 | - | Sarajevo - Jablanica section | M17 | |
| Sokolaca 1 | 540 | M5 | |||
| Sokola c a 2 | 497 | - | M5 | ||
| Bijela Vlaka | 486 | 16.09.2014 | 408 | Lot 4 Mostar North - Južna Granica, km 60+535 Bijaca-Pocitelj | A1-E73 |
| Klašnici | 477 | 31.07.2012 | 477 | Gradisca - Banja Luka section | A2-E661 |
| Jelasije | 440 | - | M17 | ||
| Tarcin | 437 | 07.10.2014 | 381 | Lot 2 Karuše – Tarcin (Sarajevo south), Lepenica - Tarcin section | A1-E73 |
| Vranduk 2 | 411 | - | Doboj-Zenica section, km 64+590 | M17 | |
| Ožega | 400 | 02.07.2014 | 400 | Lot 2 Karuše – Tarcin (Sarajevo south), Josanica - Sarajevo section. | A1-E73 |
| Tabaci š te | 398 | - | M5 | ||
| Laktaši | 389 | 31.07.2012 | 389 | Gradisca - Banja Luka section | A2-E661 |
| Ham š il | 385 | - | M5 | ||
| Jasen | 365 | - | Bugojno - Jablanica section, km 57+756 | M16.2 | |
| Kupreška Vrata | 350 | - | Bugojno - Kupres section | M16 | |
| Brodar II | 340 | - | M5 | ||
| Pasjaci | 304 | - | M5 | ||
| Ciglane | 300 | 1983 | 300 | Gradski Autoput | |
| Oštrik | 270 | 02.07.2014 | 270 | Lot 2 Karuše – Tarcin (Sarajevo south), Josanica - Sarajevo section. Completed | A1-E73 |
| Vratnik | 216 | 1983 | Sarajevo-Pale | M19 | |
| Br.47 | 214 | Visegrad-Dobrun | M5 | ||
| Kalovita Brda | 205 | - | Ljubogošta - Pale section | M19 | |
| Bradina | 200 | - | Hadžici - Konjic section, km 39+900 | M17 | |
| Surdup | 196 | 05.08.2013 | - | Gacko - Foca section | M20 |
| Mušici | 195 | - | Izacic - Bihac section | M05.0 | |
| Slatnici | 180 | 01.07.2016 | 180 | Prnjavor-Doboj | |
| Kladušnica | 180 | - | Podpaklenik - Olovo section | M18 | |
| Tunnel 1 | 170 | 01.12.2017 | 170 | Prnjavor-Laktasi | |
| Strogonik | 168 | - | M5 | ||
| Zvornik I | 163 | - | Drinjaca - Zvornik section | M19 | |
| Zvornik II | 155 | - | Drinjaca - Zvornik section | M19 | |
| Cera III | 147 | - | M5 | ||
| Bagrem | 144 | - | M17 | ||
| Hripeta III | 130 | - | M5 | ||
| Tuk III (Tunnel n°9) | 120 | - | Banja Luka - Jayce section | M16 | |
| Plosnik II | 118 | - | M5 | ||
| Bjelava | 115 | - | Podpaklenik - Olovo section | M18 | |
| Bocac | 106 | - | Banja Luka - Jayce section | M16 | |
| Korija | 97 | M19-E761 | |||
| Stupcanica Tarcin | 90 | - | Podpaklenik - Olovo section | M18 | |
| Korija 1 | 87 | - | |||
| Tunnel n°6 | 78 | - | Banja Luka - Jayce section | M16 | |
| Jajce 1 | 70 | - | Banja Luka - Jayce section | M16 | |
| Miljevina | 69 | - | Trnovo - Foca section | M18 | |
| Tunnel n°8 | 61 | - | Banja Luka - Jayce section | M16 | |
| Vratar III | 56 | - | Tjentište - Cemerno section | M18 | |
| Vratar I | 40 | - | Tjentište - Cemerno section | M18 | |
| Tunnel n°7 | 36 | - | Banja Luka - Jayce section | M16 | |
| Vratar II | 22 | - | Tjentište - Cemerno section | M18 |
How this table is compiled
Where one of these 63 lengths disagrees with an operator's own figure for Bosnia and Herzegovina, the table keeps the published value and notes the difference instead of averaging the two. The shorter half of the table totals 4.1 km against 24.46 km for the longer half, from the same number of rows.
Lengths for Bosnia and Herzegovina are recorded in metres which is how the operators publish them and why the shortest entry here reads as 22 m and not a rounded figure. After the 2010s the next busiest decade here is the 1980s with 2 openings, so the building effort came in more than one wave.
This page records the road tunnels catalogued for Bosnia and Herzegovina in a tunnel almanac maintained at this address since the late 1990s. A new scheme in Bosnia and Herzegovina would have to beat 2.94 km to change the head of this table, and that is the figure worth rechecking when one opens.
The table below lists 63 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. The tunnel column names 63 distinct entries on this page, Vijenac / 1 Mart and Suhodol / 25 Noveml among them, each traceable to the operator or administration record it was taken from.
Further down the table, Vranduk 1 is recorded at 1.01 km and Stambolcic at 0.95 km. Read down the length (m) column, the 63 values run from 22 m to 2 942 m with a midpoint at 300 m; the spread rather than the maximum is what says how uneven this set is.
Reading the figures
The longest entry is Vijenac / 1 Mart, at 2.94 km, opened in 2014. 45 of the 63 rows carry an entry in the notes - section column — 71 per cent of the table — and that column is where the qualifications live: tube counts, closures, boundaries and the reason a figure reads the way it does.
Dated entries run from 1983 to 2017, and the busiest decade is the 2010s with 16 recorded openings. The material on this page is held in 13 captions rather than in running text, 124 words of it, each written against the image or row it belongs to by the compiler who put the page together.
Roughly 16 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. Laid end to end the entries on this page would run 28.56 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
The longest stands 0.14 km clear of the next longest, which is the margin to watch when a new scheme is announced. Only 18 of the 63 rows carry anything in the date of opening column, so that field describes a minority of this table and the rest of the rows are recorded without it.
58 entries fall below a kilometre, short enough that portals and approaches usually decided their cost more than the bore itself. The captions name 20 distinct places and structures — Tarcin, Sarajevo and Karuše among them — and those names are the index into the length tables where each is recorded with its own figure.
Questions about Bosnia and Herzegovina
What is the longest road tunnel in Bosnia and Herzegovina?
On the figures recorded here it is Vijenac / 1 Mart, at 2.94 km, opened in 2014. It heads a table of 63 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for Bosnia and Herzegovina?
63 entries with a recorded length appear on this page, from 0.02 km at the short end to 2.94 km at the top, with the middle of the set around 0.3 km.
How far back do the opening dates go?
The earliest dated entry opened in 1983 and the most recent in 2017, so this page covers 34 years across 7 distinct opening years. A date here is the opening to traffic, which on these 18 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for Bosnia and Herzegovina?
The median entry measures 0.3 km and the middle half of the table runs from 0.13 km to 0.55 km. The headline figure of 2.94 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in Bosnia and Herzegovina built?
The busiest decade recorded here is the 2010s, with 16 openings, then the 1980s with 2, and 16 of the dated entries opened from 2000 onwards. That is 89 per cent of the 18 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Cite this page
Road Tunnels in Bosnia and Herzegovina — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/Bosnia-Herzegovina/list.html
Related record tables
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length
- Road Tunnels in Brazil — 103 Listed by Length