The World's Longest TunnelsRoad · Rail · Subsea · Canal
Road tunnel portal in Slovakia: Carpathian forested ridge with a new twin-tube portal, after rain, everything wet and reflective, a dead-centre symmetrical composition. (AI-generated image) AI
AI-generated image

Slovakia

Road Tunnels in Slovakia — Complete List by Length

8 of those 27 are recorded as under construction or planned, the longest of them Prešov at 2.52 km, so the count includes them while every measured figure — the range, the median, the total — describes the 19 rows carrying traffic today: an unopened bore cannot hold a record.

The table below lists 27 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. The median entry measures 1 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure.

The middle half of the table runs from 0.34 km to 2.67 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 6.46 km, which is the part of the table that changes when a single scheme opens.

The record table

How this archive measures: lengths, bores, dates and ordering

Road Tunnels in Slovakia — Complete List by Length
TunnelLength (m)Year of openingKrajOkresNotesRoad
Visnové7 4602012ZILZA-MTVišnové - Dubná Skala section. Explor. tunnel on Aug 2002 finished, northern tube started on 2004D1
Korbelka5 7982012ZILMT-RKTurany - Ivachnová sectionD1
Branisko4 97529.6.2003PREPO-LEBeharovce - Branisko section. 1st tube,Bored section: 4822 m. 2nd tube planned.D1
Havran2 6952012ZILRKTurany - Ivachnová sectionD1
Ovciarsko2 6672010ZILZAHricovské Podhradie - Visnové section. Exploration tunnel breakthrough 04.1998 now conservedD1
Prešov2 520PRJPREPOFricovce - Prešov section (other variant hp: 220 m)D1
Povazsky Chlmec2 218PRJZILZAŽilina, Strážov - Brodno sectionD3
Cebrat2 0802012ZILRKTurany - Ivachnová sectionD1
Ondrejová1 6002009TREPBPovazská Bystrica z. - Vrtizer sectionD1
Sitina1 43903.2007BRABALamacská cesta - Staré Grunty section. Shortest tube: 1314 m. Works start: 04.2003D2
Žilina1 3702010ZILZASecond tube: 1370 m. Hricovské Podhradie - Višnové sectionD1
Dargov1 050PRJKOSKS-TVBidovce - Pozdišovce sectionD1
Bôrik9992007PREPPShortest tube: 993 m. Mengusovce - Janovce sectionD1
Pol'ana9062008ZILCAShortest tube: 898 m. Cadca - Skalité sectionD3
Nitra800PRJNot definitive lenghtR1
Hrad7921944BRABACity of Bratislava, since 1983 not a road tunnel, only for tramways
Sibenik630PRJShortest tube: 590 m. Section Levoca-NemesaniD1
Horelica60529.10.2004ZILCACadca bypassD3
Kysucka584PRJZILKMProposed as Višnové - Kysucke N.M. variantD3
Nededza500PRJZILZAProposed as Višnové - Kysucke N.M. variantD18
Vadicov500PRJZILKMProposed as Višnové - Kysucke N.M. variantD18
Svrcinovec4642008ZILCASHortest tube: 456 m. Cadca - Skalité sectionD3
Brezovec3382010ZILZASecond tube: 338 m / Hricovské Podhradie - Višnové sectionD1
Stratená3241971PREPPI67
Lucivná2502006PREPPSecond tube: 250 m. Vazec - Mengusovce sectionD1
Hôrky1902010ZILZASecond tube: 190 m. Hricovské Podhradie - Višnové sectionD1
Hodzovo namestie1011980BRABACity of Bratislava

How this table is compiled

The shortest recorded entry is 0.1 km against 7.46 km at the top, a spread of 73.86x across the same table. The three longest entries alone account for 18.23 km of the 35.05 km on this page, which is 52 per cent of the total from 3 of 19 rows.

Where one of these 19 lengths disagrees with an operator's own figure for Slovakia, the table keeps the published value and notes the difference instead of averaging the two. The 19 rows for Slovakia are ordered by length, not by date, so the 2012 opening sits well down the table without being any less current.

Lengths for Slovakia are recorded in metres which is how the operators publish them and why the shortest entry here reads as 101 m and not a rounded figure. The longest entry is 73.9 times the shortest and 7.5 times the median, which is the quickest measure of how uneven the table is.

A new scheme in Slovakia would have to beat 7.46 km to change the head of this table, and that is the figure worth rechecking when one opens. Eighth on the list is Sitina at 1.44 km, which is where the table stops being about record holders and starts being about ordinary infrastructure.

Dated entries run from 1944 to 2012, and the busiest decade is the 2000s with 8 recorded openings. The table on this page runs to 27 rows and records Tunnel, Length (m), Year of opening, Kraj and Okres for each of them, which is the shape the original compiler chose rather than one imposed here.

Reading the figures

2 of the 19 measured entries exceed five kilometres, and those are the ones that carry a full ventilation and escape regime. Laid end to end the entries on this page would run 35.05 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.

The dated entries carry 11 distinct opening years across 68 years, and the median opening year is 2008. Read down the length (m) column, the 27 values run from 101 m to 7 460 m with a midpoint at 906 m; the spread rather than the maximum is what says how uneven this set is.

The ten longest average 3.11 km against 0.44 km for everything below them, and that ratio is the clearest thing this table says about the distribution. The tunnel column names 27 distinct entries on this page, Visnové and Korbelka among them, each traceable to the operator or administration record it was taken from.

Dates for Slovakia refer to opening to traffic, not breakthrough, so the 1944 entry was under construction for some years before that. The captions name 17 distinct places and structures — Višnové, Podhradie and Kysucke among them — and those names are the index into the length tables where each is recorded with its own figure.

The material on this page is held in 17 captions rather than in running text, 158 words of it, each written against the image or row it belongs to by the compiler who put the page together. Ventilation and escape provision, not bore length, drive most of the cost on modern road tunnels in Slovakia.

Questions about Slovakia

What is the longest road tunnel in Slovakia?

On the figures recorded here it is Visnové, at 7.46 km, opened in 2012. It heads a table of 27 entries ordered by bore length, not by span, cost or construction difficulty.

How many road tunnels are listed for Slovakia?

27 entries with a recorded length appear on this page, of which 19 carry traffic today and 8 are under construction or planned. The 19 in service run from 0.1 km at the short end to 7.46 km at the top, with the middle of the set around 1 km.

How far back do the opening dates go?

The earliest dated entry opened in 1944 and the most recent in 2012, so this page covers 68 years across 11 distinct opening years. A date here is the opening to traffic, which on these 19 dated rows is one to two years after breakthrough.

What is a typical length among the road tunnels listed for Slovakia?

The median entry measures 1 km and the middle half of the table runs from 0.34 km to 2.67 km. The headline figure of 7.46 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.

When were most of the road tunnels in Slovakia built?

The busiest decade recorded here is the 2000s, with 8 openings, then the 2010s with 8, and 16 of the dated entries opened from 2000 onwards. That is 42 per cent of the 19 dated rows in a single decade, which says as much about when the route was funded as about the engineering.

Operators and administrations

This page listed 8 external addresses; 2 of them still hold the material they were listed for and are shown above. The other 6 were checked against the content of the page each leads to, not merely its status code, and did not survive it.

Cite this page

Road Tunnels in Slovakia — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/slovakia/list.html

Related record tables