The median entry measures 2.05 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.16 km against 3.7 km at the top, a spread of 23.12x across the same table.
The middle half of the table runs from 0.25 km to 3.1 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 3.54 km, which is the part of the table that changes when a single scheme opens.
The three longest entries alone account for 10.16 km of the 19.12 km on this page, which is 53 per cent of the total from 3 of 10 rows. 5 entries sit above the median and 5 at or below it, so the table is evenly weighted and not clustered at one end.
- 10entries listed
- 3.7 kmlongest bore
- 2008–2012openings span
- 19.12 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Date of opening | Notes | Road |
|---|---|---|---|---|
| CTE II | 3 700 | 2012 | Two tubes. C&C | CTE |
| PIE – Ubi rd 2 | 3 500 | 19.09.2008 | Under Pelton Canal and Airport rd. | KPE |
| ECP – Nicoll | 2 960 | 19.09.2008 | Under Geylang river | KPE |
| Ubi rd 2 – Defi Lane 3 | 2 600 | 19.09.2008 | KPE | |
| CTE | 2 400 | Two tubes | CTE | |
| CTE I | 1 700 | Two tubes. C&C | CTE | |
| Nicoll – PIE | 1 600 | 19.09.2008 | KPE | |
| Serangoon | 255 | 2011 | Works start: 2007 | PIE |
| Bendemeer | 245 | 2011 | Works start: 2007 | PIE |
| MacPherson | 160 | 2011 | Works start: 2007 | PIE |
How this table is compiled
Dated entries run from 2008 to 2012, and the busiest decade is the 2000s with 4 recorded openings. The table on this page runs to 10 rows and records Tunnel, Length (m), Date of opening, Notes and Road for each of them, which is the shape the original compiler chose rather than one imposed here.
Further down the table, Serangoon is recorded at 0.26 km and Bendemeer at 0.25 km. Read down the length (m) column, the 10 values run from 160 m to 3 700 m with a midpoint at 2 050 m; the spread rather than the maximum is what says how uneven this set is.
Where one of these 10 lengths disagrees with an operator's own figure for Singapore, the table keeps the published value and notes the difference instead of averaging the two. The 10 rows for Singapore are ordered by length, not by date, so the 2012 opening sits well down the table without being any less current.
Lengths for Singapore are recorded in metres which is how the operators publish them and why the shortest entry here reads as 160 m and not a rounded figure. The longest entry is 23.1 times the shortest and 1.8 times the median, which is the quickest measure of how uneven the table is.
A new scheme in Singapore would have to beat 3.7 km to change the head of this table, and that is the figure worth rechecking when one opens. The dated entries fall across 3 different years, which is a rough measure of whether this was a sustained programme or a handful of separate schemes.
Reading the figures
Dates for Singapore refer to opening to traffic, not breakthrough, so the 2008 entry was under construction for some years before that. Laid end to end the entries on this page would run 19.12 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
The tunnel column names 10 distinct entries on this page, CTE II and PIE – Ubi rd 2 among them, each traceable to the operator or administration record it was taken from. The road column sorts these 10 rows into 3 groups, the largest being KPE with 4, then CTE with 3 and PIE with 3.
8 of the 10 rows carry an entry in the notes column — 80 per cent of the table — and that column is where the qualifications live: tube counts, closures, boundaries and the reason a figure reads the way it does. Subsea tunnels are usually built with a low point well below sea level and pumped continuously.
The table below lists 10 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. The date of opening column sorts these 8 rows into 3 groups, the largest being 19.09.2008 with 4, then 2011 with 3 and 2012 with 1.
The longest entry is CTE II, at 3.7 km, opened in 2012. A tunnel list for Singapore reads differently from a neighbouring country's: 2 of these 10 structures pass three kilometres, and the same journey time is bought with one long bore in one country and a dozen short ones in another.
Questions about Singapore
What is the longest road tunnel in Singapore?
On the figures recorded here it is CTE II, at 3.7 km, opened in 2012. It heads a table of 10 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for Singapore?
10 entries with a recorded length appear on this page, from 0.16 km at the short end to 3.7 km at the top, with the middle of the set around 2.05 km.
How far back do the opening dates go?
The earliest dated entry opened in 2008 and the most recent in 2012, so this page covers 4 years across 3 distinct opening years. A date here is the opening to traffic, which on these 8 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for Singapore?
The median entry measures 2.05 km and the middle half of the table runs from 0.25 km to 3.1 km. The headline figure of 3.7 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in Singapore built?
The busiest decade recorded here is the 2000s, with 4 openings, then the 2010s with 4, and 8 of the dated entries opened from 2000 onwards. That is 50 per cent of the 8 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Cite this page
Road Tunnels in Singapore — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/singapore/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length