The median entry measures 0.43 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.2 km against 2.07 km at the top, a spread of 10.36x across the same table.
The middle half of the table runs from 0.32 km to 0.69 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 1.72 km, which is the part of the table that changes when a single scheme opens.
Dated entries run from 2008 to 2009, and the busiest decade is the 2000s with 3 recorded openings. The table on this page runs to 15 rows and records Tunnel, Length (m), Date of opening, Notes and Road for each of them, which is the shape the original compiler chose rather than one imposed here.
- 15entries listed
- 2.07 kmlongest bore
- 2008–2009openings span
- 9.71 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Date of opening | Notes | Road |
|---|---|---|---|---|
| Dedinje | 2 071 | 2009? | Belgrade. city tunnel | |
| Manojle | 1 860 | 2 tubes. Grdelica cliff. motorway Nis - Presevo (MK border). | 1 | |
| Šargan | 775 | Užice - Mokra Gora (BIH border). Near Mokra Cora | 5 | |
| Železnik | 690 | 2008 | 2 tubes. Belgrade bypass | |
| Terazije | 600 | 4 lanes (2 + 2). Belgrade. City tunnel. Renovated 1990 | ||
| Lipak | 600 | 2008 | 2 tubes. Belgrade bypass | |
| Predejane | 560 | Grdelica cliff. Motorway Nis - Presevo (MK border) | 1 | |
| Ovcar Banja | 430 | between Cacak and Pozega | 5 | |
| Miseluk | 362 | 2 tubes. Novi Sad. Reopened 11.10.2005 | ||
| Bozinjevac | 350 | Grdelica cliff. Motorway Nis - Presevo (MK border) | 1 | |
| Krznici | 340 | Grdelica cliff. Nis - Presevo (MK border) | 1 | |
| ? | 320 | Grdelica cliff. Nis - Presevo (MK border) | 1 | |
| Sarlah | 300 | Near Pirot. Nis - Dimitrovgrad (BG border) | 1-12 | |
| Bocevica | 250 | Grdelica cliff. Motorway Nis - Presevo (MK border) | 1 | |
| Garinje | 200 | Grdelica cliff. Motorway Nis - Presevo (MK border) | 1 |
How this table is compiled
The three longest entries alone account for 4.71 km of the 9.71 km on this page, which is 48 per cent of the total from 3 of 15 rows. The shorter half of the table totals 2.12 km against 7.59 km for the longer half, from the same number of rows.
Where one of these 15 lengths disagrees with an operator's own figure for Serbia, the table keeps the published value and notes the difference instead of averaging the two. The 15 rows for Serbia are ordered by length, not by date, so the 2009 opening sits well down the table without being any less current.
Roughly 3 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 6 distinct places and structures — Presevo, Mokra and Gora among them — and those names are the index into the length tables where each is recorded with its own figure.
Lengths for Serbia are recorded in metres which is how the operators publish them and why the shortest entry here reads as 200 m and not a rounded figure. The longest entry is 10.4 times the shortest and 4.8 times the median, which is the quickest measure of how uneven the table is.
Dates for Serbia refer to opening to traffic, not breakthrough, so the 2008 entry was under construction for some years before that. Laid end to end the entries on this page would run 9.71 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
Reading the figures
Eighth on the list is Ovcar Banja at 0.43 km, which is where the table stops being about record holders and starts being about ordinary infrastructure. The ten longest average 0.83 km against 0.28 km for everything below them, and that ratio is the clearest thing this table says about the distribution.
Read down the length (m) column, the 15 values run from 200 m to 2 071 m with a midpoint at 430 m; the spread rather than the maximum is what says how uneven this set is. Ventilation and escape provision, not bore length, drive most of the cost on modern road tunnels in Serbia.
The material on this page is held in 11 captions rather than in running text, 81 words of it, each written against the image or row it belongs to by the compiler who put the page together. Many entries in Serbia carry a second figure for the parallel tube, added when the crossing was duplicated.
The table below lists 15 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. A new scheme in Serbia would have to beat 2.07 km to change the head of this table, and that is the figure worth rechecking when one opens.
Second and third place go to Manojle at 1.86 km and Šargan at 0.78 km. 15 of the 15 rows carry an entry in the notes column — 100 per cent of the table — and that column is where the qualifications live: tube counts, closures, boundaries and the reason a figure reads the way it does.
Questions about Serbia
What is the longest road tunnel in Serbia?
On the figures recorded here it is Dedinje, at 2.07 km, opened in 2009. It heads a table of 15 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for Serbia?
15 entries with a recorded length appear on this page, from 0.2 km at the short end to 2.07 km at the top, with the middle of the set around 0.43 km.
How far back do the opening dates go?
The earliest dated entry opened in 2008 and the most recent in 2009, so this page covers 1 years. A date here is the opening to traffic, which on these 3 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for Serbia?
The median entry measures 0.43 km and the middle half of the table runs from 0.32 km to 0.69 km. The headline figure of 2.07 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in Serbia built?
The busiest decade recorded here is the 2000s, with 3 openings, and 3 of the dated entries opened from 2000 onwards. That is 100 per cent of the 3 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Cite this page
Road Tunnels in Serbia — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/serbia/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length