4 of those 42 are recorded as under construction or planned, the longest of them Chang Su at 6.4 km, so the count includes them while every measured figure — the range, the median, the total — describes the 38 rows carrying traffic today: an unopened bore cannot hold a record.
The table below lists 42 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. Where one of these 38 lengths disagrees with an operator's own figure for South Korea, the table keeps the published value and notes the difference instead of averaging the two.
The entries sum to roughly 58.26 km of bore, an average of about 1.53 km each, though that average describes no actual row. Lengths for South Korea are recorded in metres which is how the operators publish them and why the shortest entry here reads as 153 m and not a rounded figure.
- 42entries listed
- 4.6 kmlongest bore
- 1970–2009openings span
- 58.26 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Tunnel | Length (m) | Year of opening | Province | Notes | Road |
|---|---|---|---|---|---|
| Chang Su | 6 400 | CHB | Under construction. Taejon - Hamyang Expressway | ||
| Jungnyeong | 4 600 | 19.12.2001 | CUB-KYB | Longest motorway tunnel. Artif.part: 4520 m. Click here for pictures | Jungang Highway |
| Neungdong | 4 580 | 18.06.2006 | Shortest tube: 4534 m | N24 Sanwae – Sangbuk | |
| Ch’oup | 4 400 | 2001 | PUS | Ch’oup - Manduk | |
| Sapaesan | 3 993 | 06.2006 | KWA | Shortest tube: 3971 m. 4 lanes each | Seoul North beltway |
| Sansung | 3 500 | 2005 | PUS | Hwanung - Jangjeondong. Work started: 1998 | |
| Pusan - Koje-do | 3 384 | 2009 | PUS | World's deepest immersed tunnel (-50 m). Works start: 2004 | |
| Chunma | 2 920 | PRJ | PUS | North bridge road project | |
| Baygyang | 2 340 | 1997 | PUS | ||
| Ssangyong - Kyobo | 2 330 | PRJ | PUS | ||
| Chimbu | 2 312 | 1999 | |||
| Kudok | 1 870 | PUS | |||
| Hwangr-yong | 1 860 | 07.1994 | PUS | Namhae Expressway | |
| Anmin | 1 818 | KYN | Town Chinae. Second tube: planned | ||
| Kwangon beach | 1 700 | PUS | Subsea tunnel | ||
| Namsan 2nd | 1 621 | 04.12.1970 | SEU | Town Seoul | |
| Manduk | 1 600 | 04.1988 | PUS | Parallel to Hwangr-yong | |
| Buk Ak | 1 580 | 1994 | Shortest tube: 1574 m | ||
| Toigewon-Eujungbu | 1 534 | Provincial road | |||
| Namsan 1st | 1 530 | 08.1970 | SEU | Town Seoul | |
| Taegu-Pohang | 1 330 | KYB | Taegu - Pohang highway | ||
| Namsan 3rd | 1 280 | 31.03.1978 | SEU | Town Seoul | |
| Suam | 1 250 | KYO | Town Ansan. Two tubes | ||
| Daejon | 1 100 | 1998 | KYB | Yongju | |
| Ulsong | 1 040 | KYB | Work start:1999 | ||
| Bukan-Kyongjoo | 936 | Provincial road | |||
| Pugak | 925 | SEU | Town Seoul | ||
| Jechon-Shigock | 910 | Provincial road | |||
| Gungun | 700 | Shortest tube: 690 m. Souhaean Highway | |||
| Sorae | 700 | SEU | Shortest tube: 690 m. Seoul Loop Highway | ||
| Jinyoung | 660 | Shortest tube: 650 m. Nanhae Highway | |||
| Shinjung | 650 | CUB | Iksan-Pohang Expressway | ||
| Kaehwa | 635 | 12.2000 | SEU | Shortest tube : 630 m | |
| Kug | 575 | SEU | Town Seoul | ||
| Pusan City | 565 | PUS | Town Pusan | ||
| Duckchon | 550 | CUB | Iksan-Pohang Expressway | ||
| Kumhwa | 550 | SEU | Town Seoul | ||
| Daeduk | 408 | Shortest tube: 408 m. Honam Highway | |||
| Samch-ong | 400 | SEU | Town Seoul | ||
| Chong-un | 325 | SEU | Town Seoul | ||
| Samgdo | 212 | SEU | Town Seoul | ||
| Saijk | 153 | SEU | Shortest tube: 144 m. Town Seoul |
| — | Province (Do) | Main Town |
|---|---|---|
| KWA | Kwangiu | Kwangiu |
| KYB | Kyongsangbuk | Taegu |
| KYN | Kyongsangnam | Ch’ang-Won |
| KYO | Kyonggi | Suwon |
| PUS | Pusan | Pusan |
| TAE | Taegu | Taegu |
How this table is compiled
The median entry measures 1.18 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.15 km against 4.6 km at the top, a spread of 30.07x across the same table.
The middle half of the table runs from 0.62 km to 1.86 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 2.74 km, which is the part of the table that changes when a single scheme opens.
The three longest entries alone account for 13.58 km of the 58.26 km on this page, which is 23 per cent of the total from 3 of 38 rows. 19 entries sit above the median and 19 at or below it, so the table is evenly weighted and not clustered at one end.
This page records the road tunnels catalogued for South Korea in a tunnel almanac maintained at this address since the late 1990s. Laid end to end the entries on this page would run 58.26 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
Second and third place go to Neungdong at 4.58 km and Ch’oup at 4.4 km. Read down the length (m) column, the 42 values run from 153 m to 6 400 m with a midpoint at 1 305 m; the spread rather than the maximum is what says how uneven this set is.
Reading the figures
Dated entries run from 1970 to 2009, and the busiest decade is the 2000s with 7 recorded openings. The table on this page runs to 42 rows and records Tunnel, Length (m), Year of opening, Province and Notes for each of them, which is the shape the original compiler chose rather than one imposed here.
A new scheme in South Korea would have to beat 4.6 km to change the head of this table, and that is the figure worth rechecking when one opens. 8 of the 38 entries fall within a quarter of the median length, which is how tightly this particular list clusters around its typical structure.
The 38 rows for South Korea are ordered by length, not by date, so the 2009 opening sits well down the table without being any less current. The ten longest average 3.28 km against 0.91 km for everything below them, and that ratio is the clearest thing this table says about the distribution.
The shorter half of the table totals 11.99 km against 46.26 km for the longer half, from the same number of rows. Only 5 of the 42 rows carry anything in the road column, so that field describes a minority of this table and the rest of the rows are recorded without it.
The dated entries carry 12 distinct opening years across 39 years, and the median opening year is 1999. The material on this page is held in 8 captions rather than in running text, 58 words of it, each written against the image or row it belongs to by the compiler who put the page together.
Questions about South Korea
What is the longest road tunnel in South Korea?
On the figures recorded here it is Jungnyeong, at 4.6 km, opened in 2001. It heads a table of 42 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for South Korea?
42 entries with a recorded length appear on this page, of which 38 carry traffic today and 4 are under construction or planned. The 38 in service run from 0.15 km at the short end to 4.6 km at the top, with the middle of the set around 1.18 km.
How far back do the opening dates go?
The earliest dated entry opened in 1970 and the most recent in 2009, so this page covers 39 years across 12 distinct opening years. A date here is the opening to traffic, which on these 16 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for South Korea?
The median entry measures 1.18 km and the middle half of the table runs from 0.62 km to 1.86 km. The headline figure of 4.6 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in South Korea built?
The busiest decade recorded here is the 2000s, with 7 openings, then the 1990s with 5, and 7 of the dated entries opened from 2000 onwards. That is 44 per cent of the 16 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Cite this page
Road Tunnels in South Korea — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/korea/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length