Lötschberg opened in 2007 and Koralm 18 years later in 2025, and that gap usually matters more than the length difference. The median railway tunnel in this archive measures 15.3 km, so both entries here are well clear of the ordinary case and the comparison is between two outliers rather than two typical crossings.
A 18-year gap spans real changes in ventilation, escape provision and excavation method, so the two were not built to the same standard. Lötschberg is 1.05 times the length of Koralm, and it is the ratio rather than the 1.68 km that says how differently the two crossings had to be ventilated and escaped.
At over twenty kilometres Lötschberg sits in the small group of bores long enough to need intermediate ventilation and a full escape regime. This archive separates 4 classes of structure and both entries here are indexed under railway tunnel, which decides the table each is ranked in and the convention its length was measured by.
- 5entries listed
Side by side
Lötschberg is recorded on data/rail.html and Koralm on data/rail.html, compiled to the same convention, which is what makes the two figures comparable at all.
How this archive measures: lengths, bores, dates and ordering
| Measure | Lötschberg | Koralm |
|---|---|---|
| Length | 34.58 km | 32.9 km |
| Length in metres | 34 577 m | 32 900 m |
| Opened | 2007 | 2025 |
| Class | railway tunnel | railway tunnel |
| Difference | 1.68 km longer | — |
How this table is compiled
Lötschberg and Koralm are compared here on the figures this archive records for each, taken from the same sources and the same measurement convention. Lötschberg belongs to the 2000s and Koralm to the 2020s, two decades in which what a tunnel had to provide by way of escape and ventilation was not the same thing.
Lötschberg is the longer of the two at 34.58 km, ahead of Koralm at 32.9 km, a difference of 1.68 km. Driven end to end the two would run 67.48 km, which is the figure to hold against the 57.1 km of the longest single railway tunnel in the record.
That gap is about 5 per cent of the longer bore, which is the figure worth holding on to rather than the raw metres. Both rows are reachable from the railway tunnel table they were taken from, where the note column carries the tube count, the gradient and any reconstruction Lötschberg or Koralm has had.
Across every class this archive records, Lötschberg stands 8th by length and Koralm 9th, so the pair sits inside the top 9 of 244 structures. 16 other structures in this record opened within two years of Koralm, which is the cohort it was designed alongside and the fairer comparison for how it was built.
The 2000s account for 53 entries in this archive, and Lötschberg is one of them, which is the context a single opening date does not carry on its own. Both pass ten kilometres, which 161 of the 244 structures recorded here manage, so this is a comparison inside a small group rather than across the field.
Reading the figures
Neither holds the record: Gotthard Base at 57.1 km is the longest railway tunnel recorded here, 22.53 km ahead of Lötschberg. Opening year means the year traffic was admitted. Where a structure has been lengthened by a later extension the current figure is the one recorded, with the original noted alongside it.
Both are recorded in this archive as railway tunnels, so the measurement convention is identical and the comparison is direct. Water management is the maintenance problem that never ends, and drainage design decides its cost. Cost figures are excluded throughout this archive, because currency, inflation and differing project scope make them close to meaningless in comparison.
7 recorded structures are longer than Lötschberg, the nearest of them Shenzhen at 35.66 km. A hard shoulder inside a tunnel is expensive width, which is why a breakdown there is treated as an emergency. Base tunnels replaced summit lines that climbed by spiral and switchback, and several of those older routes survive above them.
Koralm was designed under the modern regime, with cross-passage spacing and emergency ventilation specified from the outset. Among the railway tunnels this archive records, Lötschberg stands 8th by length and Koralm 9th, adjacent in the ranking. Catenary needs headroom a road tunnel does not, so an electrified bore is taller for the same traffic.
Widening an existing bore is rarely economic, so capacity is added by driving a second one alongside. Sequential excavation is slower per metre and far more tolerant of ground that changes without warning. Reconstruction after a fire is recorded because it usually changes both the profile and the ventilation arrangement.
Questions about this record
Which is longer, Lötschberg or Koralm?
Lötschberg, at 34.58 km against 32.9 km — a difference of 1.68 km, or 5 per cent of the longer bore. Both are portal-to-portal figures as published by the operator or the responsible administration.
Was Lötschberg harder to build than Koralm?
Not necessarily, and its 1.68 km of extra length is the weakest evidence available. Geology, water and the number of headings decide difficulty; Koralm at 32.9 km may well have been the harder job, and nothing in a length column would show it.
Which of the two opened first?
Lötschberg, in 2007, 18 years before Koralm in 2025. Both dates are the admission of traffic, so Lötschberg was already carrying it while Koralm was still being driven.
Are the two figures measured the same way?
Yes. Both are recorded in this archive as railway tunnels, portal to portal along the carriageway or track centre line, in metres, as published by the operator or the responsible administration.
Other pages in this section
- Arlberg vs Daliangshan No: length, opening date and class compared
- Bømlafjord vs Qing-Huang: length, opening date and class compared
- Changxing vs Bømlafjord: length, opening date and class compared
- Chunnel vs Yulhyeon: length, opening date and class compared
- Daliangshan No vs Muzhailing: length, opening date and class compared
- Eiksund vs Karmøy: length, opening date and class compared
- Gotthard Base vs Sei-kan: length, opening date and class compared
- Tunnel comparisons: length, depth and opening date, side by side
- Jinpingshan vs St. Gotthard / San Gottardo: length and opening date
- Karmøy vs Oslofjord: length, opening date and class compared
- Koralm vs New Guanjiao: length, opening date and class compared
- Laerdal vs Gotthard Base: length, opening date and class compared
- Laerdal vs Ryfylke: length, opening date and class compared
- Mont-Blanc / Monte Bianco vs Fréjus: length, opening date, class
- Muzhailing vs Zigana: length, opening date and class compared
- New Guanjiao vs Guadarrama: length, opening date and class compared
- Qing-Huang vs Eiksund: length, opening date and class compared
- Ryfylke vs Eiksund: length, opening date and class compared
- Sandoy vs Tokyo Aqua: length, opening date and class compared
- Sei-kan vs Chunnel: length, opening date and class compared
- Shanghai Airport Link vs Songshan Lake: length and opening date
- Shenzhen vs Lötschberg: length, opening date and class compared
- Simplon-I vs Fréjus: length, opening date and class compared
- Songshan Lake vs Shenzhen: length, opening date and class compared
- St. Gotthard / San Gottardo vs Laerdal: length, opening date, class
- St. Gotthard / San Gottardo vs Tiantaishan: length and opening date
- Tianshan Shengli vs Laerdal: length, opening date and class compared
- Tianshan Shengli vs Yamate: length, opening date and class compared
- Tiantaishan vs Arlberg: length, opening date and class compared
- Tokyo Aqua vs Changxing: length, opening date and class compared
- Yamate vs Zhongnanshan: length, opening date and class compared
- Yulhyeon vs Shanghai Airport Link: length, opening date and class
- Zhongnanshan vs Jinpingshan: length, opening date and class compared
- Zhongnanshan vs Laerdal: length, opening date and class compared
Cite this page
Lötschberg vs Koralm: length, opening date and class compared. The World's Longest Tunnels. https://www.lotsberg.net/compare/lotschberg-vs-koralm.html
Related record tables
- Tunnel comparisons: length, depth and opening date
- Laerdal vs Gotthard Base: length and opening date
- Laerdal vs Ryfylke: length and opening date
- St. Gotthard / San Gottardo vs Laerdal: length and opening year
- Mont-Blanc / Monte Bianco vs Fréjus: length and opening date
- Zhongnanshan vs Laerdal: length and opening date
- Tianshan Shengli vs Laerdal: length and opening date
- Yamate vs Zhongnanshan: length and opening date
- Ryfylke vs Eiksund: length and opening date
- Simplon-I vs Fréjus: length and opening date
- Tianshan Shengli vs Yamate: length and opening date
- Zhongnanshan vs Jinpingshan: length and opening date