The median entry measures 0.74 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.5 km against 2.61 km at the top, a spread of 5.19x across the same table.
This page records the bridges and viaducts catalogued for Austria in a tunnel almanac maintained at this address since the late 1990s. Laid end to end the entries on this page would run 52.73 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
The middle half of the table runs from 0.63 km to 1.11 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 1.44 km, which is the part of the table that changes when a single scheme opens.
- 57entries listed
- 1964–2007openings span
- 52.73 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Viaduct/Bridge | Length (m) | Date of opening | Kreis | Section-Notes | Road |
|---|---|---|---|---|---|
| Krems - Pressingberg | 2 607 | 27.06.1980 | SP | Rennwag-Gmünd. Dir. Villach. Height: 84 m | A10 |
| Schönberg-Matrei | 2 107 | 03.12.1967 | IL | Schönberg-Matrei | A13 |
| Lueg | 1 738 | 22.12.1968 | IL | Nößlach-Brennersee | A13 |
| Rauchenkatch | 1 702 | 22.07.1978 | SP | Opposite viaduct: 1699 m. Rennwag-Gmünd | A10 |
| Pressingberg | 1 633 | 27.06.1980 | SP | Rennwag-Gmünd. Dir. Salzburg. | A10 |
| Edlach | 1 616 | 20.10.1984 | LI | Rottenmann-Trieben | A9 |
| Saag | 1 611 | 31.07.1970 | LI | Velden East-Pörtschach | A2 |
| Moor (Selzthal) | 1 400 | 28.06.1980 | LI | Opposite viaduct: 1005 m. Selzthal-Rottenmann | A9 |
| Donau (Krems) | 1 256 | 1972 | KS-KR | S33 | |
| Puchreit | 1 167 | 27.06.1980 | SP | Rennwag-Gmünd | A10 |
| Selzthal | 1 145 | 28.06.1980 | LI | Opposite viaduct: 1075 m. Selzthal-Rottenmann | A9 |
| Prater Hochstrasse | 1 132 | 22.12.1970 | W | River Donau. Two bridges (720+412m). Wien Handelskai -A22 | A23 |
| Trieben | 1 126 | 20.10.1984 | LI | Trieben-Treglwang | A9 |
| Winkl | 1 120 | VL | St.Jakob-Karawankentunnel | A11 | |
| St. Lorenzen | 1 105 | 20.10.1984 | LI | Rottenmann-Trieben | A9 |
| Lavant (Twinberg) | 1 079 | 26.07.1986 | WO | Opposite viaduct: 935 m (31.10.2007). Wolfsberg N.-St.Leonhard. Height: 166 m | A2 |
| Wilden | 1 043 | 22.11.1991 | BZ | Langen-Wald | S16 |
| Gaishorn | 1 034 | 20.10.1984 | LI | Trieben-Treglwang | A9 |
| Bishofshofen* | 1 007 | JO | B311 | ||
| Maiselgraben | 988 | 11.08.1978 | GU | St.Michael-Ubelbach | A9 |
| Krems | 974 | 27.06.1980 | SP | Rennwag-Gmünd. Dir. Salzburg. | A10 |
| Ardning | 968 | 21.10.1983 | LI | Spital-Ardning | A9 |
| Plansee | 950 | RE | |||
| Nordbrücke | 935 | 19.12.1964 | W | River Donau | B227 |
| Reichs | 865 | 08.11.1980 | W | River Donau | B8 |
| Altersberg | 839 | 02.07.1976 | SP | Gmünd –Spittal an der Drau | A10 |
| Europa | 820 | 03.12.1967 | IL | Height: 190 m | A13 |
| Gstötten | 780 | 21.11.1985 | RI | Ort-Suben | A8 |
| Donaustädt | 741 | 1997 | W | River Donau | |
| Gschnitztal | 710 | 22.12.1968 | IL | Matrei-Nößlach. Opposite viaduct: 710 m | A13 |
| Stausee | 702 | KL | B91 | ||
| Auenbach | 687 | 31.10.2007 | WO | Opposite viaduct: 680 m (26.07.1986). Wolfsberg N.-St.Leonhard | A2 |
| Paschberg | 678 | 2000? | I | A13 | |
| Florisdorfer | 676 | 03.10.1978 | W | River Donau | B226 |
| Rachenbach | 675 | 02.07.1976 | SP | Gmünd –Spittal an der Drau | A10 |
| Inn (Suben) | 674 | 30.06.1983 | DM | River Peene | A20 |
| Obernberg | 674 | 22.12.1968 | IL | Nößlach-Brennersee | A13 |
| Ofnerhansl | 650 | 27.09.1982 | VO | P12, Mooskirchen-Steinberg. Opposite viaduct: 650 m (2007) | A2 |
| Treglwang | 650 | 26.05.1993 | LI | Treglwang-Kalwang | A9 |
| Schwarzbach | 649 | 27.09.1982 | WO | St.Leonhard-Packsattel | A2 |
| Arnwiesen | 645 | 19.12.1981 | WZ | Sinabelkirchen-Gleisdorf South | A2 |
| Hammerboden-Pirkeggen | 643 | 27.06.1980 | SP | Rennwag-Gmünd | A10 |
| Schottwien | 631 | 1989 | NK | Gloggnitz-Maria Schutz. Height: 130 m | S6 |
| Brigittenauer | 630 | 25.10.1982 | W | River Donau | B14a |
| Mur | 610 | 1976 | JU | S36 | |
| Steinbrückenbach | 606 | 02.07.1976 | SP | Gmünd –Spittal an der Drau | A10 |
| Wollanig | 600 | 20.06.1988 | VI-VL | Villach west-Ossiacher See | A10 |
| Gail | 578 | 09.07.1977 | VL | Villach Warmbad-Villach Centrum | A2 |
| Donau (Mauthausen) | 573 | PE-AM | B123 | ||
| Volkermarkter Stausee | 566 | VK | B82 | ||
| Gmünd | 561 | 02.07.1976 | SP | Gmünd –Spittal an der Drau | A10 |
| Donau (Pöchlarn) | 560 | ME | |||
| Stogersbach | 550 | OW | Pinkafeld-Lafnitztal | A2 | |
| Bernbach | 523 | 27.09.1982 | WO | St.Leonhard-Packsattel | A2 |
| Peggau | 520 | GU | Peggau-Badl | S35 | |
| Granitzbach | 515 | WO | Griffen-St.Andra | A2 | |
| Schmidbauernbach | 502 | 27.09.1982 | VO | Steinberg-Modriach. Opposite viaduct: 500 m (2007) | A2 |
How this table is compiled
Dated entries run from 1964 to 2007, and the busiest decade is the 1980s with 24 recorded openings. Read down the length (m) column, the 57 values run from 502 m to 2 607 m with a midpoint at 741 m; the spread rather than the maximum is what says how uneven this set is.
Roughly 2 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 6 distinct places and structures — Leonhard, Gmünd and Donau among them — and those names are the index into the length tables where each is recorded with its own figure.
The three longest entries alone account for 6.45 km of the 52.73 km on this page, which is 12 per cent of the total from 3 of 57 rows. The shorter half of the table totals 17.24 km against 35.49 km for the longer half, from the same number of rows.
Where one of these 57 lengths disagrees with an operator's own figure for Austria, the table keeps the published value and notes the difference instead of averaging the two. The 57 rows for Austria are ordered by length, not by date, so the 2007 opening sits well down the table without being any less current.
Lengths for Austria are recorded in metres which is how the operators publish them and why the shortest entry here reads as 502 m and not a rounded figure. The longest entry is 5.2 times the shortest and 3.5 times the median, which is the quickest measure of how uneven the table is.
Reading the figures
The dated entries carry 22 distinct opening years across 43 years, and the median opening year is 1980. The material on this page is held in 6 captions rather than in running text, 53 words of it, each written against the image or row it belongs to by the compiler who put the page together.
The dated entries fall across 22 different years, which is a rough measure of whether this was a sustained programme or a handful of separate schemes. The viaduct/bridge column names 57 distinct entries on this page, Krems - Pressingberg and Schönberg-Matrei among them, each traceable to the operator or administration record it was taken from.
The table on this page runs to 57 rows and records Viaduct/Bridge, Length (m), Date of opening, Kreis and Section-Notes for each of them, which is the shape the original compiler chose rather than one imposed here. A long viaduct on modest piers can therefore outrank a shorter but far more dramatic single-span crossing.
The table below lists 57 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. The ten longest average 1.68 km against 0.76 km for everything below them, and that ratio is the clearest thing this table says about the distribution.
48 of the 57 rows carry an entry in the section-notes column — 84 per cent of the table — and that column is where the qualifications live: tube counts, closures, boundaries and the reason a figure reads the way it does. Bridges and viaducts are listed by total deck length, not by main span.
Questions about Austria
How many bridges and viaducts are listed for Austria?
57 entries with a recorded length appear on this page, from 0.5 km at the short end to 2.61 km at the top, with the middle of the set around 0.74 km.
How far back do the opening dates go?
The earliest dated entry opened in 1964 and the most recent in 2007, so this page covers 43 years across 22 distinct opening years. A date here is the opening to traffic, which on these 47 dated rows is one to two years after breakthrough.
What is a typical length among the bridges and viaducts listed for Austria?
The median entry measures 0.74 km and the middle half of the table runs from 0.63 km to 1.11 km. The headline figure of 2.61 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the bridges and viaducts in Austria built?
The busiest decade recorded here is the 1980s, with 24 openings, then the 1970s with 12, and 2 of the dated entries opened from 2000 onwards. That is 51 per cent of the 47 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
How close is the top of the Austria table?
The longest stands 0.5 km clear of the next entry, and nothing else comes within ten per cent of it. A newly announced scheme therefore has to beat 2.61 km to change the head of this list.
Other pages in this section
Cite this page
Bridges and Viaducts in Austria — 57 Listed by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/austria/bru.html
Related record tables
- Bridges and Viaducts in the United States
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Bridges and Viaducts in Denmark — 44 Listed by Length
- Bridges and Viaducts in France — 42 Listed by Length
- Bridges and Viaducts in Italy — 345 Listed by Length
- Bridges and Viaducts in Italy — 219 Listed by Length
- Bridges and Viaducts in Italy — 239 Listed by Length
- Bridges and Viaducts in Norway — 58 Listed by Length
- Bridges and Viaducts in Norway — 59 Listed by Length