32 rows are rendered in total, so 3 of them carry a note or a blank where a length belongs and are shown without being counted. The middle half of the table runs from 0.9 km to 6.57 km, and that band is where most of the engineering on this page actually sits.
The entries sum to roughly 130.89 km of bore, an average of about 4.51 km each, though that average describes no actual row. Where one of these 29 lengths disagrees with an operator's own figure for the world, the table keeps the published value and notes the difference instead of averaging the two.
The median entry measures 2.7 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 0.15 km against 16.92 km at the top, a spread of 114.31x across the same table.
- 29entries listed
- 1949–2007openings span
- 130.89 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Year | TUNNEL Length | Location Country | Vehicle where fire occurred | Most possible cause of fire | Duration of fire | Consequences people | Damaged vehicles | Structures and installations |
|---|---|---|---|---|---|---|---|---|
| 1949 | Holland 2 550 m | New York USA | Lorry with 11 tons of carbondisulfid | Load falling off lorry explosion | 4 h | 66 injured smoke inhalation | 10 lorries 13 cars | Serious damage over 200 m |
| 1974 | Mont Blanc 11 600 m | France-Italy | Lorry | Motor | 15 min | 1 injured | ||
| 1976 | Crossing BP - A6 430 m | Paris France | Lorry with drums of 16 tons polyesterfilm | High speed | 1 h | 12 light injuries (smoke) | 1 lorry | Serious damage over 150 m |
| 1978 | Velsen 770 m | Velsen Nederland | 4 lorries 2 cars | Front-rear- collision | 1h 20 | 5 dead 5 injured | 4 lorries 2 cars | Serious damage over 30 m |
| 1979 | Nihonzaka 2 045 m | Shitzuoka Japan | 4 lorries 2 cars | Front-rear- collision | 159 h | 7 dead 1 injured | 127 lorries 46 cars | Serious damage over 1 100 m |
| 1980 | Kajiwara 740 m | Japan | 1 truck with 3600 litres of paint in 200 cans | Collision with side wall and overturning | 1 dead | 1 truck, 4t 1 truck, 10t | Serious damage over 280 m | |
| 1982 | Caldecott 1 028 m | Oakland USA | 1 car, 1 coach 1 lorry with 33000 l of petrol | Front-rear- collision | 2h 40 | 7 dead 2 injured | 3 lorries 1 coach 4 cars | Serious damage over 580 m |
| 1982 3. Nov. | Salang 2 700 m | Mazar-e-Sharif - Kabul Afghanistan | Soviet military column. At least one petrol truck. | Front collission Destroyed tank | > 400 dead | |||
| 1983 | Pecorila Galleria 662 m | Gênes Savone Italy | Lorry wth fish | Front-rear- collision | 9 dead 22 injured | 10 cars | Little damage | |
| 1986 | L'Arme 1 105 m | Nice France | Lorry with trailer | Braking after high speed | 3 dead 5 injured | 1 lorry 4 cars | Some equipment destroyed | |
| 1987 | Gumefens 343 m | Berne Switzerland | 1 lorry | Front-rear- collision | 2 h | 2 dead | 2 lorries 1 van | Slight damage |
| 1990 | Røldal 4 656 m | Røldal Norway | VW transporter with trailer | 50 min | 1 injured | Little damage | ||
| 1990 | Mont Blanc 11 600 m | France-Italy | Lorry with 20 tons of cotton | Motor | 2 injured | 1 lorry | Some equipment destroyed | |
| 1993 | Serra Ripoli 442 m | Bologne-Florence Italy | 1 car + lorry with rolls of paper | Collision | 2h 30 | 4 dead 4 injured | 5 lorries 11 cars | Little damage |
| 1993 | Hovden 1 290m | Høyanger Norway | Motor cycle 2 cars | Front-rear- collision | 1h | 5 injured in the collision. | 1 motor cycle 2 cars | 111 m insulation material destroyed |
| 1994 | Huguenot 3 914 m | South-Afrika | Bus with 45 passengers | Electrical fault | 1h | 1 dead 28 injured | 1 coach | Serious damage |
| 1995 10. April | Pfander 6 719 m | Austria | Lorry with trailer | Collision | 1h | 3 dead in the collision 4 injured | 1 lorry 1 van 1 car | Serious damage |
| 1996 18. March | Isola delle Femmine 148 m | Palermo Italy | 1 tanker with liquid gas + 1 little bus | Front-rear- collision | 5 dead 20 injured | 1 tanker 1 bus 18 cars | Serious damage tunnel closed for 2.5 days | |
| 1999 24. March | Mont Blanc 11 600 m | France-Italy | Lorry with flour and margarine | Oil leakage Motor | 39 dead | 23 lorries 10 cars 1 motor cycle 2 fire engines | Serious damage Tunnel reopens 22.12.2001 | |
| 1999 29. May | Tauern 6 401 m | A10 Salzburg-Spittal Austria | Lorry with paint | Front-rear-collision 4 cars and 2 lorries | 12 dead 49 injured | 14 lorries 26 cars | Serious damage | |
| 2000 14. July | Seljestad 1 272 m | E 134 Drammen - Haugesund Norway | The trailer-truck that caused the multiple collision had a diesel fire in the engine room before the collision. | Front-rear-collision A trailer-truck pushed a car into 4 cars that had stopped behind another truck. | 45 min | 6 injured | 1 lorry 6 cars 1 MC | Serious damage. NOK 1 mill. Tunnel colsed for 1 1/2 days. |
| 2001 28. May | Prapontin 4 409 m | A 32 Torino - Bardonecchia Italy | Romanian truck loaded with beets | Mechanical problem | 19 injured by smoke | Closed til 6. June in direction Frejus (west) | ||
| 2001 6. Aug. | Gleinalm 8 320 m | A 9 near Graz Austria | Car | Front collission lorry - car | 5 dead 4 injured | 1 lorry 1 car | ||
| 2001 24. Oct. | St. Gotthard 16 918 m | A 2 Switzerland | Lorry | Front collission 2 lorries | 2 days | 11 dead | 13 lorries 4 vans 6 cars | Serious damage. Closed 2 months |
| 2003 14 April | Baregg 1 390 m | A 1 Switzerland | Lorry Car | Fron-rear collission A lorry drove into the last car in a pile-up | 1 dead 5 injured | |||
| 2005 4. June | Fréjus 12 895 m | T 2 France - Italy | 1. load: Tyres 2. load Chese 3. load: scrap (2 dead) 4. load: glue | Diesel leakage in lorry loaded with tyres. Spread to 3 other lorries. | 6 hours. Fire extinguished before it reached glue load in 4th lorry | 2 dead. 21 treated for smoke inhalation | 4 lorries 3 fire fighting vehicles | Serious damage Tunnel closed |
| 2005 25 Dec | m | B 31 Germany | 2 cars | Front collission | 5 dead | |||
| 2006 16. sept. | Viamala 742 m | A 13 Switzerland | Car + bus | Front collission | 6 dead 6 injured | 1 bus 2 cars | ||
| 2007 23 Mar. | Burnley 3400 m | Australia | 3 lorries 4 cars | Rear-end collission | 3 dead | |||
| 2007 10 Sep. | San Martino 4 800 m | SS 36 Italy | Lorry | A lorry crashed into the wall and caught fire | 2 dead 10 injured | |||
| 2007 12 Oct. | m | I 5 USA | Lorries | 2 lorries collided. Another 13 lorries crashed into the accident site and caugt fire | 10 injured |
How this table is compiled
9 of the 29 measured entries exceed five kilometres, and those are the ones that carry a full ventilation and escape regime. Laid end to end the entries on this page would run 130.89 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
The route table lists 29 structures with a recorded length, giving both carriageways where the two bores differ. The material on this page is held in 33 captions rather than in running text, 288 words of it, each written against the image or row it belongs to by the compiler who put the page together.
Dated entries run from 1949 to 2007, and the busiest decade is the 1990s with 9 recorded openings. They are not uniform: the fullest runs to 18 words and the briefest to 6, and on a page of this kind the long ones are where the explanation lives — the caption carries what the picture cannot.
The three longest entries alone account for 41.41 km of the 130.89 km on this page, which is 32 per cent of the total from 3 of 29 rows. The shorter half of the table totals 14.53 km against 116.36 km for the longer half, from the same number of rows.
5 entries reach ten kilometres and 0 reach twenty, a distribution that decides how much of this table needs full mechanical ventilation. Only 15 of the 31 rows carry anything in the duration of fire column, so that field describes a minority of this table and the rest of the rows are recorded without it.
Reading the figures
Lengths for the world are recorded in metres which is how the operators publish them and why the shortest entry here reads as 148 m and not a rounded figure. 3 of the 29 entries fall within a quarter of the median length, which is how tightly this particular list clusters around its typical structure.
After the 1990s the next busiest decade here is the 2000s with 9 openings, so the building effort came in more than one wave. The year column names 29 distinct entries on this page, 1982 3. Nov. and 1995 10. April among them, each traceable to the operator or administration record it was taken from.
Between the longest and the tenth-longest the drop is 12.12 km, which is the part of the table that changes when a single scheme opens. The ten longest average 9.73 km against 1.77 km for everything below them, and that ratio is the clearest thing this table says about the distribution.
The table on this page runs to 31 rows and records Year, TUNNEL Length, Location Country, Vehicle where fire occurred and Most possible cause of fire for each of them, which is the shape the original compiler chose rather than one imposed here. Traffic figures are deliberately excluded, since they date far faster than the structures themselves.
The longest entry is 114.3 times the shortest and 6.3 times the median, which is the quickest measure of how uneven the table is. The dated entries fall across 22 different years, which is a rough measure of whether this was a sustained programme or a handful of separate schemes.
Questions about Archive article
How many records are listed for the world?
29 entries with a recorded length appear on this page, from 0.15 km at the short end to 16.92 km at the top, with the middle of the set around 2.7 km. The table renders 32 rows in total; the rest carry a note or a blank where a length belongs.
How far back do the opening dates go?
The earliest dated entry opened in 1949 and the most recent in 2007, so this page covers 58 years across 22 distinct opening years. A date here is the opening to traffic, which on these 29 dated rows is one to two years after breakthrough.
What is a typical length among the records listed for the world?
The median entry measures 2.7 km and the middle half of the table runs from 0.9 km to 6.57 km. The headline figure of 16.92 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the records in the world built?
The busiest decade recorded here is the 1990s, with 9 openings, then the 2000s with 9, and 9 of the dated entries opened from 2000 onwards. That is 31 per cent of the 29 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
How close is the top of the the world table?
The longest stands 4.02 km clear of the next entry, and nothing else comes within ten per cent of it. A newly announced scheme therefore has to beat 16.92 km to change the head of this list.
Other pages in this section
Operators and administrations
This page listed 5 external addresses; one of them still holds the material they were listed for and is shown above. The other 4 were checked against the content of the page each leads to, not merely its status code, and did not survive it.
Cite this page
The World's longest tunnel page - Fire accidents in road tunnels. The World's Longest Tunnels. https://www.lotsberg.net/artiklar/brann/en_tab.html