The World's Longest TunnelsRoad · Rail · Subsea · Canal
Road tunnel portal in Italy: Apennine limestone ridge, twin concrete motorway portals with a projecting canopy, in drifting mist, shot at 35mm. (AI-generated image) AI
AI-generated image

Italy

Road Tunnels in Italy — Complete List by Length

The table below lists 85 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. Lengths for Italy are recorded in metres which is how the operators publish them and why the shortest entry here reads as 3 073 m and not a rounded figure.

The median entry measures 4.38 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shortest recorded entry is 3.07 km against 12.9 km at the top, a spread of 4.20x across the same table.

The middle half of the table runs from 3.37 km to 7.25 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 8.2 km, which is the part of the table that changes when a single scheme opens.

The record table

How this archive measures: lengths, bores, dates and ordering

Road Tunnels in Italy — Complete List by Length
StateTunnelLength (m)Date of openingRegionProvinceNotesRoad
I - FCiriegia - Mercantour17 300PRJPIECNWorks stopped for environmental oppositions
IValico (Lavarone)15 140PRJVEN-TAAVI-TNSecond tube: 15080 mA31
I å–FFrejus12 89812.07.1980PIETOIn Italy: 6320 m. Altitude: 1297 m . Second tube: 12848 m (breakthrough:17.11.2014, opened in 2019)T4
I å– FMonte Bianco (Mont Blanc)11 61119.07.1965 09.03.2002VDAAOIn Italy: 3971 m. Altitude: 1395.5 m (Portals: I 1381 m, F 1274 m). Breakthrough: 15.09.1962T1
IGran Sasso d’Italia10 17301.12.1984ABRAQ - TESecond tube: 10173 m (1995) . / Service tube (6000 m) in projectA24
IVariante di valico8 71023.12.2015EMR-TOSBO - FISecond tube: 8506 m.Breakthrough: 21.12.2010A1var
ISant’ Antonio Morignone7 92518.02.2000LOMSOThree linked tunnels: S. Antonio (2360 m) + Tola (1757 m) + Cepina (3241 m) + Artificial part (602 m)SS38
ISanta Lucia7 73404.2020TOSFIDirection FirenzeA1
IMalo (Priabona)6 231ucVENVISecond tube: 6231 m. Pedemontana Veneta Toll Highway. Castelgomberto-MaloSPV
IMonterosso6 163PRJLIGGESecond tube: 6157 m. Gronda di Ponente Motorway
IPretunnel Gran San Bernardo Sud6 150VDAAOArtificial tunnel. Covered roadT2
ICrocefisso dello Zillastro6 049PRJCALRCDirection Bagnara. Bagnara-Bovalino highway
IAmandola6 023PRJLIGGESecond tube: 5978 m. Gronda di Ponente Motorway
IMadonna della Montagna5 980PRJCALRCDirection Bovalino. Bagnara-Bovalino highway
IGuinza5 9602004MAR-UMBPU-PGSecond tube: 5937 m (PRJ). Southbound breakthrough: 17.04.2003. Tunnel completed in 2004, not yet opened to traffic due to delay in access roadsE78
I-CHGran San Bernardo5 79819.03.1964VDAAOAltitude: CH portal 1918 m - I portal 1875 m; Parallel safety tunnel under constructionT2
IColle dei Signori5 500PRJTAABZBolzano bypassA22
ICostamezza5 33803.2016LAZLTSecond tube: 5338 m. Pedemontana di FormiaSS7 var
ISirta-Selvetta5 307PRJLOMSOSecond tube: 5275 m. Morbegno bypassSS38
ICels5 24508.12.1992PIETOSecond tube: 5141 mA32
IGiovanni Paolo II (Sellero)5 04806.02.2013LOMBSBreakthrough: 18.05.2010SS42
ISanta Maria di Pozzano5 03516.07.2014CAMNAFive tunnels linked by artificial parts. Also named: Seiano or Vico Equense. 1497 m opened in 1989SS145var
ISan Nazario4 800PRJVENVISecond tube: 4800 mSS47
ICosta di Sorreley4 72519.12.1997VDAAOTwo lanes dir. GSB- one lane dir. AostaSS27-R39
ILecco- San Martino4 70025.10.1999LOMLCSecond tube: 4340 m Lecco section: double deck configurationSS36
ISchio Valdagno Pass4 69003.07.1999VENVIUnder M.ZovoSC
IMadonna del Carmine4 600PRJMARANSS16
ISan Domenico (Carrito)4 56707.08.1978ABRAQSecond tube: 4567 mA25
ISan Benedetto4 4901998MAR-UMBAP - PGAltitude: 1000 mSS685
IPrapontin4 40907.07.1995PIETOSecond tube: 4409mA32
IColle Giardino4 34725.07.2003LAZRISecond tube: 4 242 mSS4
ISan Rocco4 18114.09.1989ABR-LAZAQ-RISecond tube: 4181 mA24
ICaltanissetta4 053UCSICCLSecond tube: 4053 m (3918-3878 m). Bbreakthroughs: 15.10.2015 - 15.06.2017SS640
IForca di Cerro4 03012.12.1998UMBPG"Three Valli Umbra" roadSS685
IComelico4 00031.07.1986VENBLSS52
ILurago3 990PRJLOMCOSecond tube: 3990 m. Albese-Veduggio Motorway
ICornello3 980MAR-UMBMC-PGWorks stoppedSS361
IFara3 9641992FVGPNSS251
IMeleres3 895PRJVENBLCortina bypassSS51
IVal di Sambro3 89023.12.2015EMRBOSecond tube: 3773 m. Variante di ValicoA1var
ISerra Rotonda3 87618.04.2015BASPZSecond tube: 3868 m (24.02.2015)A2
ICave Ovest3 79028.06.1995VENTV – BLSecond tube: Cave Est 3153 mA27
IGola della Rossa3 76614.02.2018MARANSecond tube: 664 m. Breakthrough southern tube: 6.5.2015SS76
ISt.Oyen3 7472019VDAAOSS27
ILa Rupe (Mezzolombardo)3 74020.10.2008TAATNSecond tube: 3695 m (21.03.2009). Trento-RocchettaSP235
IValnerina3 69410.12.2013UMBTRBreakthrough: 14.02.2009SS79bis
IVilla Carcina3 652PRJLOMBSSecond tube: 3652 m. Valtrompia motorway
ISan Silvestro3 62321.07.2007ABRPE-CHFrancavilla bypassSS714
IAgnese3 6151992TAATNSS240
ISan Pietro3 586PRJVENVISecond tube: 3507 mA31
IBreva3 53607.04.2004LOMCOCalozzo Mianico - DongoSS340 dir
ICeresole3 5351991-93PIETOTwo linked tunnels. Gradient: 15%SS460
IAlba3 527PRJPIECNSecond tube: 3356 m. Under river Tanaro. Project stoppedA33
ITelva3 500PRJVENBLFeltre bypassSS50bis var
IVarano3 47115.01.2015MARMCSecond tube: 3460 m (breakthrough:29.2.2012). Quadrilatero Marche UmbriaSS77
IOmegna3 4271992PIEVBSS229
IFurlo3 3911991MARPUSecond tube: 3391 m (1985)SP3
IMontenegrone3 37807.01.2008LOMBGExit Nembro (tunnel 332 m) insideSP671
ICostamolin3 361PRJVENBLSecond tube: 3181 mA27
IPre Saint Didier3 36013.08.2002VDAAOSecond tube: 2880 m (29.06.2001)A5
ITotoga3 3521997TAATNSP80
IPetraro3 34505.08.1978SICMESecond tube: 3327 m (1992)A20
IMonte Barro3 34225.10.1999LOMLCSecond tube: 3304 m. Natural parts: 3253 m.SS36
IValsassina3 32824.02.2006LOMLCLecco-Poggi. Exit Belledo (2.113 m of tunnels) insideSS36rac
IAlbogasio (Oria)3 31410.10.2012LOMCOBreakthrough: 16.04.2003SS340
IGranarolo3 304PRJLIGGEGronda di Ponente
ISolagna3 300PRJVENVISecond tube: 3300 mSS47
I - FNew Col di Tenda (Tende)3 25202.2020PIECNOne way, direction FranceSS20
IVilleneuve3 23025.05.1994VDAAOSecond tube: 3213 mA5
IRegoledo3 2271987LOMLCSecond tube: 3220 mSS36
IGussago3 219PRJLOMBSValtrompia Motorway. One way
I - FCol di Tenda (Tende)3 2171882PIECNIn Italy: 1717 m. Altitude: 1321 m. In future: one way, direction ItalySS20-D6204
ICodissago3 201PRJVENBLSecond tube: 3143 mA27
ILimina3 1501984CALRCSGC Jonio - TirrenoSS682
IVerduno3 200prjPIECNSecond tube: 3200 m. works stoppedA33
ICampione-Punta Forbisicle3 1861967-2009LOMBSTwo linked tunnels: Campione (2462 m, 1967) and P.ta Forbisicle (688 m, 20.07.2009)+artificial partsSS45bis
IMonte Benedetto (Kuchelberg)3 178PRJTAABZTown Merano
ICalavà3 16005.08.1978SICMESecond tube: 3114 mA20
IAvise3 11225.05.1994VDAAOSecond tube: 3066 m (14.09.95)A5
ILe Casse3 08024.12.2008PIEVBSS659
IGhettarello3 0952021MARANAncona Harbour-A14.Works start 01.2015
IDolonne3 07307.03.2007VDAAOSecond tube: 2981 m .A5
ISan Vito3 0471992VENBL - VINear Arsie'SS50 bis var
ISan Giovanni Rotondo3 000PRJPGLFGTwo tubesSS272
IMadonna degli Angeli3 000PRJLIGSVSS1bis

How this table is compiled

The entries sum to roughly 130.93 km of bore, an average of about 5.46 km each, though that average describes no actual row. Eighth on the list is Pretunnel Gran San Bernardo Sud at 6.15 km, which is where the table stops being about record holders and starts being about ordinary infrastructure.

The three longest entries alone account for 34.68 km of the 130.93 km on this page, which is 26 per cent of the total from 3 of 24 rows. 12 entries sit above the median and 12 at or below it, so the table is evenly weighted and not clustered at one end.

Where one of these 24 lengths disagrees with an operator's own figure for Italy, the table keeps the published value and notes the difference instead of averaging the two. The 24 rows for Italy are ordered by length, not by date, so the 2021 opening sits well down the table without being any less current.

9 of the 24 measured entries exceed five kilometres, and those are the ones that carry a full ventilation and escape regime. Laid end to end the entries on this page would run 130.93 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.

Dated entries run from 1882 to 2021, and the busiest decade is the 1990s with 18 recorded openings. The table on this page runs to 85 rows and records State, Tunnel, Length (m), Date of opening and Region for each of them, which is the shape the original compiler chose rather than one imposed here.

Reading the figures

A new scheme in Italy would have to beat 12.9 km to change the head of this table, and that is the figure worth rechecking when one opens. The longest entry is 4.2 times the shortest and 2.9 times the median, which is the quickest measure of how uneven the table is.

The dated entries carry 33 distinct opening years across 139 years, and the median opening year is 1999. The material on this page is held in 35 captions rather than in running text, 353 words of it, each written against the image or row it belongs to by the compiler who put the page together.

Roughly 25 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 33 distinct places and structures — Italy, Motorway and Ponente among them — and those names are the index into the length tables where each is recorded with its own figure.

The dated entries fall across 33 different years, which is a rough measure of whether this was a sustained programme or a handful of separate schemes. The tunnel column names 85 distinct entries on this page, Ciriegia - Mercantour and Valico (Lavarone) among them, each traceable to the operator or administration record it was taken from.

The ten longest average 7.96 km against 3.66 km for everything below them, and that ratio is the clearest thing this table says about the distribution. The state column sorts these 85 rows into 5 groups, the largest being I with 79, then I - F with 3 and I å–F with 1.

Questions about Italy

What is the longest road tunnel in Italy?

On the figures recorded here it is Frejus, at 12.9 km, opened in 1980. It heads a table of 85 entries ordered by bore length, not by span, cost or construction difficulty.

How many road tunnels are listed for Italy?

85 entries with a recorded length appear on this page, of which 24 carry traffic today and 61 are under construction or planned. The 24 in service run from 3.07 km at the short end to 12.9 km at the top, with the middle of the set around 4.38 km.

How far back do the opening dates go?

The earliest dated entry opened in 1882 and the most recent in 2021, so this page covers 139 years across 33 distinct opening years. A date here is the opening to traffic, which on these 56 dated rows is one to two years after breakthrough.

What is a typical length among the road tunnels listed for Italy?

The median entry measures 4.38 km and the middle half of the table runs from 3.37 km to 7.25 km. The headline figure of 12.9 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.

When were most of the road tunnels in Italy built?

The busiest decade recorded here is the 1990s, with 18 openings, then the 2000s with 11, and 25 of the dated entries opened from 2000 onwards. That is 32 per cent of the 56 dated rows in a single decade, which says as much about when the route was funded as about the engineering.

Other pages in this section

Operators and administrations

This page listed 5 external addresses; 4 of them still hold the material they were listed for and are shown above. The other one was checked against the content of the page each leads to, not merely its status code, and did not survive it.

Cite this page

Road Tunnels in Italy — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/italia/list.html

Related record tables