The table below lists 65 entries with a recorded length, each giving a name, a length in metres and, where documented, the year of opening. Lengths for Switzerland are recorded in metres which is how the operators publish them and why the shortest entry here reads as 2 000 m and not a rounded figure.
The median entry measures 3.01 km, so half the table sits below that and half above, which is a better guide to the typical structure here than the headline figure. The shorter half of the table totals 50.64 km against 113.71 km for the longer half, from the same number of rows.
The middle half of the table runs from 2.39 km to 4.44 km, and that band is where most of the engineering on this page actually sits. Between the longest and the tenth-longest the drop is 12.48 km, which is the part of the table that changes when a single scheme opens.
- 65entries listed
- 16.94 kmlongest bore
- 1964–2017openings span
- 164.35 kmtotal length
The record table
How this archive measures: lengths, bores, dates and ordering
| Country | Tunnel | Length (m) | Date of opening | Canton | Notes | Road |
|---|---|---|---|---|---|---|
| CH | St. Gotthard - San Gottardo | 16 942 | 05.09.1980 | TI - UR | Portals altitude: Göschenen: 1081 m, Airolo 1145 m | A2 |
| CH | Seelisberg | 9 292 | 12.12.1980 | NW - UR | Second tube: 9250 m | A2 |
| CH | San Bernardino | 6 596 | 01.12.1967 | GR | A13 | |
| I-CH | Gran San Bernardo | 5 798 | 19.03.1964 | VS | Altitude: 1918 m. Safety tunnel under construction | N21 |
| CH | Pretunnel Gran San Bernardo Nord | 5 660 | VS | Covered road | N21 | |
| CH | Kerenzer | 5 760 | 09.04.1986 | GL | Direction Sarganz | A3 |
| CH | Mappo-Morettina | 5 518 | 13.06.1996 | TI | Locarno bypass | A13 |
| CH | Sachseln | 5 213 | 24.09.1997 | OW | Near Sarnen | A8 |
| CH | Islisberg | 4 955 | 13.11.2009 | ZH | Second tube (east): 4955 m. Natural parts: 4680-4646 m | A4 |
| CH | Uetliberg | 4 460 | 04.05.2009 | ZH | Second tube: 4460 m. Zürich west ring. | A3 |
| CH | Sisikoner | 4 443 | 2017 | SZ-UR | A4 | |
| CH | Eyholz (Staldbach - Grosshus) | 4 255 | u.c. | VS | Visp ring, Second tube: 4231 m | A9 |
| CH | Gotschna | 4 207 | 09.12.2005 | GR | Klosters bypass | A28 |
| CH | Gorwetsch - Pfyngut | 4 190 | 2016 | VS | Second tube: 4140 m. Three linked tunnels: Gorwetsch (1705 m), Ermitage (380 m), Pfyngut (2115 m) | A9 |
| CH | Traversee de Neuchatel | 4 150 | 18.06.1993 | NE | Second tube: 3800 m (1995). East tubes: 2610 m + West tubes 745 m + Artificial parts | A5 |
| CH | Mont Terri | 4 078 | 14.11.1998 | JU | Service tunnel: 3962 m (future second tube) | A16 |
| CH | Kirchenwald | 4 000 | 2008 | LU | Second tube: 2000 m. Natural parts: 1637-1528 m (29.06.2006) | A2 |
| CH | Gorgier-Treytel | 3 960 | 07.05.2002 | NE | Two linked tubes dir. Yverdon: Gorgier (2720 m)+TC Treytel (1240 m) | A5 |
| CH | Boezberg | 3 705 | 10.1996 | AG | Second tube: 3705 m | A3 |
| CH | Brunig | 3 700 | PRJ | BE-OW | A8 | |
| CH | Mont Russelin | 3 572 | 14.11.1998 | JU | A16 | |
| CH | Munt La Schera | 3 39 4 | 1965 | GR | Portals altitude: P.so del Gallo (italian border):1810 m, La Drossa: 1706 m. Near Livigno. | N28 |
| CH | Giessbach | 3 340 | 18.05.1988 | BE | A8 | |
| CH | Lungern | 3 330 | 2012 | OW | Pilot hole breakthrough: 02.2003 | A8 |
| CH | Gubrist | 3 273 | 21.06.1985 | ZH | Second tube: 3273 m. Zürich Nordring. Third tube in project | A1 |
| CH | Vispertal | 3 260 | 04.02.1997 | VS | Part of this tunnel will be used as tube of A9 Visp (Schwarzer Graben) tunnel | N212 |
| CH | Schwarzer Graben | 3 260 | u.c. | VS | Second tube: 2630 m, Visp bypass | A9 |
| CH | La Vue des Alpes (1) | 3 250 | 1995 | NE | H20 | |
| CH | Raimeux | 3 211 | 20.11.2007 | BE | Pilot hole (3147 m), will be used as safety tunnel. Breakthrough: 31.10.2002 | A16 |
| CH | Choindez | 3 200 | 2014 | JU | Pilot hole (3024 m) works start on 10.2006, breakthrough on 06.11.2009 | A16 |
| CH | Belchen | 3 180 | 23.10.1970 | SO-BL | Second tube: 3180 m | A2 |
| CH | du Bure | 3 059 | 2012 | JU | Near Delle - French border. Works start: 15.01.2007 | A16 |
| CH | Pomy | 3 005 | 05.04.2001 | VD | Second tube: 2958 m. Portals altitude: 540-450 m | A1 |
| CH | Arrissoules | 2 987 | 05.04.2001 | VD - FR | Second tube: 2987 m | A1 |
| CH | Flimserstein / Crap da Flem | 2 923 | 28.10.2007 | GR | Breakthrough: 02.12.2004 | H19 |
| CH | St.Johann-Horburg | 2 900 | 06.12.1999 | BS | Second tube: 2900 m. St.Johann tunnel (650 m)+Dreirosen covered bridge (266 m)+Horburg tunnel (1090 m)+artificial parts | A3 |
| CH | Morschacher | 2 861 | PRJ | SZ-UR | A4 | |
| CH | Landwasser | 2 802 | 1974 | GR | Near Wiesen | N 417b |
| CH | Eggflue | 2 790 | 2000 | BE - BL | Near Grellingen | A18 |
| CH | Gorgier | 2 720 | 07.05.2002 | NE | Dir. Biel. Opposite tube linked to Treytel. Portals altitude: 500-450 m | A5 |
| CH | Vedeggio - Cassarate | 2 630 | 2012 | TI | Lugano north bypass. Parallel safety tunnel under construction since 11.2005 | A9 |
| CH | Rusel | 2 600 | PRJ | BE | Biel West bypass (Tuscherz-Alfermeé) | A5 |
| CH | Flüelen | 2 594 | 10.06.2005 | UR | A4 | |
| CH | Saaser | 2 582 | 11.11.2011 | GR | A28 | |
| CH | Langholz | 2 480 | 2015 | BE | Second tube: 2480 m. Biel East bypass | A5 |
| CH | Ligerz (Gleresse) | 2 483 | 07.05.1991 | BE | Parallel safety tunnel in project | A5 |
| CH | Graitery | 2 462 | 2012 | BE | Court-Moutier. Pilot hole completed. Works start: 6.11.2006 | A16 |
| CH | Alusuisse – Ancien Sierre | 2 450 | 2008 | VS | Two tubes, four linked tunnels: Alusuisse (1070 m), Geronde (620 m), Crete Plane (180m) (just opened on 18/11/99), and Ancien Sierre Plantzette (580 m) | A9 |
| CH | Isla Bella | 2 449 | 11.11.1983 | GR | Second tube: 2435 m (PRJ) | A13 |
| CH | San Fedele (Roveredo) | 2 381 | 2016 | GR | Pilot hole breakthrough: 06.2010 | A13 |
| CH | Hohtenn - Mittal | 2 390 | 1985 | VS | Road Gampel - L å tschberg | N509 |
| CH | Stagjitschugge | 2 306 | 14.11.2008 | VS | Visp-Zermatt | H213 |
| CH | Les Vignes | 2 300 | 15.12.1997 | FR - BE | Second tube: 2100 m | A1 |
| CH | Vigneules (Vingelz) | 2 300 | PRJ | BE | Second tube: 2300 m. Biel West bypass | A5 |
| CH | Chienberg | 2 284 | 20.12.2006 | BL | Sissach bypass | J20 |
| CH | Kublis | 2 255 | 2016 | GR | A28 | |
| CH | Cozz (Cianca Presella) | 2 240 | 01.12.1967 | GR | Tunnels Cianca Presella (artificial, 434 m)+Land (231 m)+Seda (artificial, 608 m)+Brusei(541 m)+Cozz(artificial,426 m) | A13 |
| CH | Pierre Pertuis | 2 208 | 18.11.1997 | BE | Second tube: 2050 m | A16 |
| CH | Leissigen | 2 200 | 23.06.1994 | BE | Second tube: 2200 m | A8 |
| CH | Sauges-Vaumarcus | 2 195 | 07.05.2002 | NE | Two linked tubes dir. Yverdon: Sauges (1935 m) and TC Vaumarcus (260 m) | A5 |
| CH | Aescher | 2 176 | 04.05.2009 | ZH | Second tube: 2142 m. Zürich west bypass. | A3 |
| CH | Crapteig | 2 171 | 24.10.1996 | GR | A13 | |
| CH | Susten | 2 070 | 2011 | VS | Second tube: 2070 m | A9 |
| CH | Giswil | 2 066 | 27.10.2004 | OW | A8 | |
| CH | Trin | 2 000 | 1995 | GR | Other fonts: 1738 m | N19 |
How this table is compiled
The three longest entries alone account for 32.83 km of the 164.35 km on this page, which is 20 per cent of the total from 3 of 43 rows. After the 2000s the next busiest decade here is the 1990s with 15 openings, so the building effort came in more than one wave.
Where one of these 43 lengths disagrees with an operator's own figure for Switzerland, the table keeps the published value and notes the difference instead of averaging the two. The 43 rows for Switzerland are ordered by length, not by date, so the 2017 opening sits well down the table without being any less current.
A new scheme in Switzerland would have to beat 16.94 km to change the head of this table, and that is the figure worth rechecking when one opens. The longest entry is 8.5 times the shortest and 5.6 times the median, which is the quickest measure of how uneven the table is.
8 of the 43 measured entries exceed five kilometres, and those are the ones that carry a full ventilation and escape regime. Laid end to end the entries on this page would run 164.35 km, which is a number with no engineering meaning but a useful sense of the scale of what is catalogued.
Second and third place go to Seelisberg at 9.29 km and San Bernardino at 6.6 km. The table on this page runs to 65 rows and records Country, Tunnel, Length (m), Date of opening and Canton for each of them, which is the shape the original compiler chose rather than one imposed here.
Reading the figures
The entries sum to roughly 164.35 km of bore, an average of about 3.82 km each, though that average describes no actual row. The tunnel column names 65 distinct entries on this page, St. Gotthard - San Gottardo and Seelisberg among them, each traceable to the operator or administration record it was taken from.
Dated entries run from 1964 to 2017, and the busiest decade is the 2000s with 18 recorded openings. The material on this page is held in 28 captions rather than in running text, 321 words of it, each written against the image or row it belongs to by the compiler who put the page together.
Roughly 30 of the dated entries opened in this century, which is a rough measure of how much of the network is recent. The captions name 37 distinct places and structures — Treytel, Visp and Göschenen among them — and those names are the index into the length tables where each is recorded with its own figure.
The dated entries carry 33 distinct opening years across 53 years, and the median opening year is 2001. The altitudes stated in those captions run from 1 528 to 2 958 metres above sea level across 16 recorded points, which is the dimension this page is about — height, where the length tables are about span.
They are not uniform: the fullest runs to 26 words and the briefest to 6, and on a page of this kind the long ones are where the explanation lives — the caption carries what the picture cannot. Ventilation and escape provision, not bore length, drive most of the cost on modern road tunnels in Switzerland.
Questions about Switzerland
What is the longest road tunnel in Switzerland?
On the figures recorded here it is St. Gotthard, at 16.94 km, opened in 1980. It heads a table of 65 entries ordered by bore length, not by span, cost or construction difficulty.
How many road tunnels are listed for Switzerland?
65 entries with a recorded length appear on this page, of which 43 carry traffic today and 22 are under construction or planned. The 43 in service run from 2 km at the short end to 16.94 km at the top, with the middle of the set around 3.01 km.
How far back do the opening dates go?
The earliest dated entry opened in 1964 and the most recent in 2017, so this page covers 53 years across 33 distinct opening years. A date here is the opening to traffic, which on these 58 dated rows is one to two years after breakthrough.
What is a typical length among the road tunnels listed for Switzerland?
The median entry measures 3.01 km and the middle half of the table runs from 2.39 km to 4.44 km. The headline figure of 16.94 km is the outlier, not the norm, which is why the median is the more useful number when comparing one national list against another.
When were most of the road tunnels in Switzerland built?
The busiest decade recorded here is the 2000s, with 18 openings, then the 1990s with 15, and 30 of the dated entries opened from 2000 onwards. That is 31 per cent of the 58 dated rows in a single decade, which says as much about when the route was funded as about the engineering.
Other pages in this section
- Structures on the A1 in Switzerland, Geneva to St. Margrethen
- Tunnels and Viaducts on the A3 in Switzerland, Basel to Sargans
- Structures on the Rhaetian Railway Bernina Line, St. Moritz to Tirano
- Road Tunnels in Switzerland — Complete List by Length, Part 000
- Road Tunnels in Switzerland — Complete List by Length, Part 1000
- Railway Tunnels in Switzerland — Complete List by Length
- Railway Tunnels in Switzerland — 42 Listed by Length
Operators and administrations
- Das Tunnelbau-Portal der Schweiz tunnel.ch
- Schweizer Autobahnen, Tunnels und Ortsumfahrungen autobahnen.ch
- The Rock Laboratory mont-terri.ch
This page listed 4 external addresses; 3 of them still hold the material they were listed for and are shown above. The other one was checked against the content of the page each leads to, not merely its status code, and did not survive it.
Cite this page
Road Tunnels in Switzerland — Complete List by Length. The World's Longest Tunnels. https://www.lotsberg.net/data/sveits/list.html
Related record tables
- Road Tunnels in Bosnia and Herzegovina — 63 Listed by Length
- Road Tunnels in the United Kingdom — 53 Listed by Length
- Road Tunnels in the United States, Part 000
- Road Tunnels in the United States: Full List by Length
- Road Tunnels in Andorra — 6 Listed by Length
- Road Tunnels in Argentina — 8 Listed by Length
- Road Tunnels in Australia — 38 Listed by Length
- Road Tunnels in Austria, Part 000 — 183 Listed by Length
- Road Tunnels in Austria, Part 250 — 109 Listed by Length
- Road Tunnels in Austria, Part 500 — 100 Listed by Length
- Road Tunnels in Austria — 116 Listed by Length
- Road Tunnels in Belgium — 67 Listed by Length