![]() |
Structures
on A 5: Yverdon Les Bains (A1) Solothurn (A1) ("Pied du Jura") Edited by: Eugenio A. Merzagora 2nd revision - September 2010 |
Tunnel / Viaduct | Lenght |
Lenght |
Notes |
Connection 1 "Yverdon" - A1 Geneve-St.Margrethen. Canton VD | |||
Yverdon | 3 150 m |
3 115 m |
|
Exit 2 Yverdon Les Bains Ouest | |||
FSS Yverdon-S.te Croixe | 305 m |
305 m |
|
Le Grandsonnet | 305 m |
305 m |
|
Exit 3 Grandson-Champagne | |||
Onnens | 623 m |
623 m |
|
Corcelles | 237 m | 166 m | |
Concise | 1 340 m |
1 410 m |
|
La Dia | 90 m |
90 m |
|
Lance | 310 m |
310 m |
|
La Reisse | 110 m |
110 m |
Canton NE |
Exit 4 Vaumarcus - Concise | |||
TC Vaumarcus-Sauges | / | 2 195 m | Two linked tunnel: Sauges (1935 m)+ TC Vaumarcus (260 m) |
Sauges | 1 880 m | / | Linked to Vaumarcus tunnel direction Yverdon |
Exit 5 Gorgier - St.Aubin | |||
Gorgier | 2 720 m |
/ |
Linked to Treytel tunnel direction Yverdon |
TC Treytel-Gorgier | / |
3 960 m |
Two linked tunnel: Gorgier (2720 m)+ TC Treytel (1240 m) |
Exit 6 Bevaix | |||
TC Bevaix | / | 1 680 m | |
Exit 7 Boudry-Cortaillod | |||
Chanelaz | 730 m |
730 m |
|
Chanelaz | 600 m | 535 m | |
/ | Exit 8 Areuse | ||
Areuse | 480 m |
480 m |
|
/ | Exit 8 Areuse | ||
Colombier | 415 m |
415 m |
|
Exit 9 Auvernier | |||
TC Auvernier | 180 m |
180 m |
|
Exit 10 Neuchatel Ouest | |||
Serrieres | 780 m |
780 m |
|
Exit 11 Neuchatel Centre-Serrieres | |||
Traverse� de Neuchatel | 3 800 m |
4 150 m |
Connection 12 "Neuchatel Vauseyon" - H20 Chaux de Fonds |
Exit 13 Neuchatel Est - Maladiere | |||
TC Falaises Ouest | 272 m |
272 m |
|
TC Monruz | 404 m | 404 m | Exit 14 Monruz |
TC Hauterive | 580 m |
580 m |
|
TC St.Blaise Ouest | 300 m |
300 m |
|
TC Vignier | 340 m | 340 m | |
Exit 15 Hauterive-St.Blaise | |||
Exit 16 Marin | |||
Connection 17 "Thielle" - T10 Berne | |||
Exit 18 Cornaux | |||
FFS | 90 m |
90 m |
|
Exit 19 Le Landeron-Cressier | |||
Landeron Ouest (Cressier) | 590 m |
590 m |
|
Exit 20 Le Landeron | |||
Landeron Est | 492 m |
492 m |
|
Exit 21 Neuveville. Canton BE | |||
Ligerz (Gleresse) | 2 483 m |
Parallel safety tunnel in project | |
Exit 22 Twann | |||
Exit 23 Wingrels | |||
Rusel | 2 600 m |
||
Exit 24 Vingelz | |||
Vignoules (Vingelz) | 2 300 m | 2 300 m | Exit 25 Biel West - Exit 26 Biel Centre in tunnel |
Connection T6 Berne | |||
Langholz | 2 480 m | 2 480 m | |
Connection 27 "Champs de Boujean" - A16 France | |||
Exit 28 Biel Est | |||
Passage a Gibier Stock | 126 m | 126 m | |
Pieterlen | 1 470 m | 1 470 m | |
Esso | Service Area "Pieterlen | ||
Exit 29 Pieterlen-Langnau | |||
Witi | 1 760 m | 1 760 m | |
Exit 30 Grenchen | |||
Aar | 365 m | 365 m | Canton BE-SO |
Leuzingen | 650 m | / | |
Passage a Gibier | 90 m | 90 m | |
Lusslingen | 1 230 m | 1 230 m | |
Spitalhof | 540 m | 540 m | Exit 31 Solothurn West |
Exit 32 Solothurn Sud | |||
Birchi | 1 425 m | 1 700 m | |
Exit 33 Solothurn Ost | |||
Emme | 126 m | 126 m | |
Connection 34 "Luterbach" - A1 Geneve-St.Margrethen |
Notes: (xxx) = lenght on road signal
Comments and questions to: Eugenio A. Merzagora
� 2022. Copying from the data pages is not allowed without adding the source name: "The World's longest Tunnel Page"
This page was last modified on September 28, 2010